SWAY 2.6MW Test
2.6 MW Consent Authorised Norway
Updated weekly to include the latest news, your feedback and other data.
35 Countries, 1173 Windfarms, 7307 Stakeholders, 2711 Events, 161 Vessels, 131 Turbines NEW, 35 Ports,
Filter Projects by Country
Featured Ports
Featured Port
Vlissingen - Verbrugge Terminals, The Netherlands Image of <%# Eval("PortName") %> Maximum Trenched Depth: 13.3 m
Entrance Width: 372 m
Spring Tidal Range: 5 m
Quay Length: 1200 m
Quay Loading Capability: 15 tonnes/m2
Land for Development: 70 ha
More details...



Who is generating power
Who's Generating Power?
1.  United Kingdom - 1858.40 MW
2.  Denmark - 874.48 MW
3.  China - 351.00 MW
More...
Whose Turbines are Generating?
Whose Turbines are Generating?
1.  Siemens Wind Power A/S (Siemens AG) - 1522.00 MW
2.  Vestas Offshore A/S (Vestas Wind Systems A/S) - 1404.12 MW
3.  REpower Systems AG (Suzlon Energy Limited) - 250.00 MW
Loading Map
RoleOrganisationDescription 
Developer SWAY A/S correct
Owner SWAY A/S
Percentage: Subscribe
correct
Vessels & Equipment Available for Immediate Charter
Statistics for SWAY 2.6MW Test
Wind Farm Name SWAY 2.6MW Test correct
CountryNorway
Region Rogaland correct
SeaName North Sea correct
Centre Latitude 59.146°
Centre Longitude 5.109°
Did you know? Its easy to add a map with this windfarm to your website! More...
Round, tender or call 
Development Status Consent Authorised correct
Comments on the Status 
Status Documentation Latest status information from the NVE
Capacity 2.6 MW correct
Turbine Capacity 2.6 MW correct
Number of Turbines 1 correct
Turbine Model Not Decided correct
10 Year Mean Wind Speed (2000-2009) Available online now
Other wind speed data at this location: 6 hr/day/month historic data..., BERR, NERL
(Now incorporating NERL models for USA Projects!)
Weather Forecast Services Weather Solutions For Offshore Wind Power
Rotor Diameter correct
Total Turbine Height correct
Hub Height 60 m correct
Other comments correct
Foundation Floating: Spar Floater correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Area
Water Depth Min (Chart Datum) 100 m correct
Water Depth Max (Chart Datum) 121 m correct
Depth range stated by developer 210 m - 210 m correct
Distance From Shore (reported) 7 km correct
Distance From Shore (computed from wind farm centre) 2.6 km
Export Cable Length correct
Infield Cable Length correct
Estimated Infield Cable Length This information is available in the purchased database - please enquire.
Export Cable Capacity 22 kV correct
Infield Cable Capacity correct
Number of Export Cables correct
Export Cable Type correct
Cable Description correct
Number of Offshore Substations correct
Grid Connection Point correct
Cable Landing Point correct
Annual Capacity Factor correct
Expected Life 5 years correct
Estimated Capital Cost (CapEx) This information is available in the purchased database - please enquire.
Stated Project Cost EUR(mill) 25.00 correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Port For Installation Base correct
Port For Ops and Maintenance correct
Number of homes powered annually: 1,454 homes
CO2 Reduced Per Year 2,938 tonnes
SO2 Reduced Per Year 68 tonnes
Website Visit correct

Events on SWAY 2.6MW Test
DateTypeDescriptionSourceCorrect
Subscribe
Event Type: Operation - Generating Power                                                                                                                                                                                                                                   Operation - Generating Power
The project is expected to start in Q1 Subscribe. Subscribe correct
Subscribe
Event Type: Installation - Offshore Construction Starts                                                                                                                                                                                                                    Installation - Offshore Construction Starts
Estimated offshore construction start in Q1 Subscribe. Subscribe correct
30-Apr-2009
Event Type: Planning - Consent Authorised                                                                                                                                                                                                                                  Planning - Consent Authorised
Consent granted Visit correct
Jun-2008
Event Type: Planning - Consent Application Submitted                                                                                                                                                                                                                       Planning - Consent Application Submitted
Application for consent made Other correct

Please click to add windfarm events via this link, providing approximate date etc. Possible events include consent submission, approval, installation, generating power etc.

Be the first to comment on SWAY 2.6MW Test offshore wind farm Please note, your comment will take 1 hour to appear.

Your Name * :  
Web Site (optional) : http://  
Comment * :  
* required


Weather Forecast for SWAY 2.6MW Test More weather tools available on 4C Interactive Map. More weather forecast tools