Taggen Vindpark
300 MW Consent Application Submitted Sweden
Updated weekly to include the latest news, your feedback and other data.
35 Countries, 1173 Windfarms, 7307 Stakeholders, 2711 Events, 161 Vessels, 131 Turbines NEW, 35 Ports,
Filter Projects by Country
Featured Ports
Featured Port
BOW Terminal Vlissingen, The Netherlands Image of <%# Eval("PortName") %> Maximum Trenched Depth: 11 m
Entrance Width: 250 m
Spring Tidal Range: 5 m
Quay Length: 1400 m
Quay Loading Capability: 15 tonnes/m2
Land for Development: 7 ha
More details...



Who is generating power
Who's Generating Power?
1.  United Kingdom - 1858.40 MW
2.  Denmark - 874.48 MW
3.  China - 351.00 MW
More...
Whose Turbines are Generating?
Whose Turbines are Generating?
1.  Siemens Wind Power A/S (Siemens AG) - 1522.00 MW
2.  Vestas Offshore A/S (Vestas Wind Systems A/S) - 1404.12 MW
3.  REpower Systems AG (Suzlon Energy Limited) - 250.00 MW
Loading Map
RoleOrganisationDescription 
Developer Taggen Vindpark Elnät AB (Taggen Vindpark AB) 100% owned by Taggen Vindpark AB and is responsible for powerline transformers, submarine cables, etc correct
Developer Taggen Vindpark AB Owned by Vattenfall AB 50% and Hanöbukten Offshore AB 50% correct
Owner Wallenstam AB Stakeholder in project through Hanöbukten Offshore AB which is owned by Wallenstam and it's partner Triventus(Hanöbukten Offshore AB owns 50% of Taggen Vindpark AB)
Percentage: Subscribe
correct
Owner Triventus Consulting AB Stakeholder in project through Hanöbukten Offshore AB which is owned by Triventus and it's partner Wallenstam(Hanöbukten Offshore AB owns 50% of Taggen Vindpark AB)
Percentage: Subscribe
correct
Owner Vattenfall Europe Windkraft GmbH (Vattenfall AB) 50% Stakeholder in project
Percentage: Subscribe
correct
Vessels & Equipment Available for Immediate Charter
Statistics for Taggen Vindpark
Wind Farm Name Taggen Vindpark correct
CountrySweden
Region Kristianstad Kommun correct
SeaName Baltic Sea correct
Centre Latitude 55.862°
Centre Longitude 14.566°
Did you know? Its easy to add a map with this windfarm to your website! More...
Round, tender or call 
Development Status Consent Application Submitted correct
Comments on the Status 
Status Documentation
Capacity 300 MW correct
Turbine Capacity 3.6 MW - 7 MW correct
Number of Turbines 60 - 83 correct
Turbine Model Not Decided correct
10 Year Mean Wind Speed (2000-2009) Available online now
Other wind speed data at this location: 6 hr/day/month historic data..., BERR, NERL
(Now incorporating NERL models for USA Projects!)
Weather Forecast Services Weather Solutions For Offshore Wind Power
Rotor Diameter 130 m correct
Total Turbine Height 165 m correct
Hub Height 100 m correct
Other comments Hub Height 80 - 100 m, Rotor diameter 107 - 130 m, Maximum height 170 m correct
Foundation Not Decided correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Area 50 km2
Water Depth Min (Chart Datum) 12 m correct
Water Depth Max (Chart Datum) 20 m correct
Depth range stated by developer correct
Distance From Shore (reported) 19 km correct
Distance From Shore (computed from wind farm centre) 16.3 km
Export Cable Length correct
Infield Cable Length correct
Estimated Infield Cable Length This information is available in the purchased database - please enquire.
Export Cable Capacity correct
Infield Cable Capacity correct
Number of Export Cables correct
Export Cable Type correct
Cable Description correct
Number of Offshore Substations correct
Grid Connection Point correct
Cable Landing Point correct
Annual Capacity Factor 38.00 correct
Expected Life correct
Estimated Capital Cost (CapEx) This information is available in the purchased database - please enquire.
Stated Project Cost correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Port For Installation Base correct
Port For Ops and Maintenance correct
Number of homes powered annually: 167,745 homes
CO2 Reduced Per Year 339,012 tonnes
SO2 Reduced Per Year 7,884 tonnes
Website Visit correct

Events on Taggen Vindpark
DateTypeDescriptionSourceCorrect
Subscribe
Event Type: Installation - Offshore Construction Starts                                                                                                                                                                                                                    Installation - Offshore Construction Starts
Possible start year of construction based on the fact permits not yet granted (Mar Subscribe) Subscribe correct

Please click to add windfarm events via this link, providing approximate date etc. Possible events include consent submission, approval, installation, generating power etc.

Be the first to comment on Taggen Vindpark offshore wind farm Please note, your comment will take 1 hour to appear.

Your Name * :  
Web Site (optional) : http://  
Comment * :  
* required


Weather Forecast for Taggen Vindpark More weather tools available on 4C Interactive Map. More weather forecast tools