Trillium Power Wind 1
414 MW Concept/Early Planning Canada
Updated weekly to include the latest news, your feedback and other data.
35 Countries, 1064 Windfarms, 6435 Stakeholders, 2329 Events, 152 Vessels, 123 Turbines NEW, 32 Ports,
A Selection of Jobs How 4C's subscribers stay ahead!
1. Comprehensive database of projects, the supply chain and key dates
2. Monthly Database Updates
3. Weekely Email notifications
4. Market Analysis Toolkit for Excel
5. iPDF Maps for Offline Use
Filter Projects by Country
Featured Ports
Featured Port
Port of Wilhelmshaven, Germany Image of <%# Eval("PortName") %> Maximum Trenched Depth: 18 m
Entrance Width: 60 m
Spring Tidal Range: 3.5 m
Quay Length: 5377 m
Quay Loading Capability: 84 tonnes/m2
Land for Development: 59 ha
More details...


Vessel Chartering Service
Offshore Wind Jobs Latest Jobs

Who is generating power
Who's Generating Power?
1.  United Kingdom - 1525 MW
2.  Denmark - 875 MW
3.  China - 446 MW
More...
Who's Building Offshore Wind Farms?
Who's Building Offshore Wind Farms?
1.  China - 1658 MW
2.  United Kingdom - 900 MW
3.  Denmark - 400 MW
More...
Whose Turbines are Generating?
Whose Turbines are Generating?
1.  Vestas Offshore A/S (Vestas Wind Systems A/S) - 1404 MW
2.  Siemens Wind Power A/S (Siemens AG) - 1337 MW
3.  Bonus energy A/S (Siemens Wind Power A/S) - 245 MW
More...
More Analysis of Offshore Wind
And more ...
How much Infield Cabling will be needed?
Who is laying the foundations?
How deep will the water be?
How long did the consenting process take?
More ...

Loading Map
RoleOrganisationDescription 
Developer Trillium Power Wind Corporation correct
Owner Trillium Power Wind Corporation correct
New Layout! Click here to view details of 3 activities performed by organisations working on Trillium Power Wind 1
Vessels on Trillium Power Wind 1
Vessels & Equipment Available for Immediate Charter
Statistics for Trillium Power Wind 1
Wind Farm Name Trillium Power Wind 1 correct
CountryCanada
Region Ontario correct
SeaName Lake Ontario correct
Centre Latitude 43.897° (Note: Estimated/Illustrative Location)
Centre Longitude -76.658° (Note: Estimated/Illustrative Location)
Did you know? Its easy to add a map with this windfarm to your website! More...
Round, tender or call 
Development Status Concept/Early Planning (Note: Project on hold) correct
Comments on the StatusOntario is not proceeding with offshore wind projects until further scientific research has been conducted on freshwater offshore wind farms. Current applications for FiT's are suspended and new applications are suspended.
Status Documentation
Capacity 414 MW correct
Turbine Capacity 3 MW correct
Number of Turbines 138 correct
Turbine Model V112-3.0 MW Offshore (Vestas) correct
10 Year Mean Wind Speed (2000-2009) Available online now
Other wind speed data at this location: 6 hr/day/month historic data..., BERR, NERL
(Now incorporating NERL models for USA Projects!)
Weather Forecast Services Weather Solutions For Offshore Wind Power
Rotor Diameter 112 m correct
Total Turbine Height 146 m correct
Hub Height 90 m correct
Other comments Hub Height will range between 80-100m correct
Foundation Not Decided (Monopile or Gravity Base) correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Area
Water Depth Min (Chart Datum) .5 m correct
Water Depth Max (Chart Datum) 38 m correct
Depth range stated by developer correct
Distance From Shore (reported) 17 km correct
Distance From Shore (computed from wind farm centre)
Export Cable Length 28 km correct
Infield Cable Length 104 km correct
Estimated Infield Cable Length This information is available in the purchased database - please enquire.
Export Cable Capacity 230 kV correct
Infield Cable Capacity 36 kV correct
Number of Export Cables 2 correct
Export Cable Type correct
Cable Description correct
Number of Offshore Substations 2 correct
Grid Connection Point Lennox Transformer Station, near Bath, Ontario correct
Cable Landing Point North of Sandhurst on Highway 33 correct
Annual Capacity Factor correct
Expected Life 22 years correct
Estimated Capital Cost (CapEx) This information is available in the purchased database - please enquire.
Stated Project Cost correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Port For Installation Base correct
Port For Ops and Maintenance correct
Number of homes powered annually: 231,488 homes
CO2 Reduced Per Year 467,837 tonnes
SO2 Reduced Per Year 10,880 tonnes
Website Visit correct

Events on Trillium Power Wind 1
DateTypeDescriptionSourceCorrect
2035
Event Type: Repowering -                                                                                                                                                                                                                                                   Repowering -
Estimated Repowering/Decommissioning Visit correct
Nov-2014
Event Type: Operation - Generating Power                                                                                                                                                                                                                                   Operation - Generating Power
Estimated Full Operations Visit correct
Aug-2013
Event Type: Operation - Generating Power                                                                                                                                                                                                                                   Operation - Generating Power
Estimated Commissioning Start Visit correct
Jul-2012
Event Type: Installation - Offshore Construction Starts                                                                                                                                                                                                                    Installation - Offshore Construction Starts
Estimated Construction Start Visit correct
28-Sep-2011
Event Type: Unknown                                                                                                                                                                                                                                                        Unknown
The developer is suing the Ontarion government after a moratorium was declared on the great lakes. Visit correct

Please click to add windfarm events via this link, providing approximate date etc. Possible events include consent submission, approval, installation, generating power etc.

Be the first to comment on Trillium Power Wind 1 offshore wind farm Please note, your comment will take 1 hour to appear.

Your Name * :  
Web Site (optional) : http://  
Comment * :  
* required


Weather Forecast for Trillium Power Wind 1 More weather tools available on 4C Interactive Map. More weather forecast tools