Tunø Knob
5 MW Fully Commissioned Denmark
Updated weekly to include the latest news, your feedback and other data.
35 Countries, 1173 Windfarms, 7307 Stakeholders, 2711 Events, 161 Vessels, 131 Turbines NEW, 35 Ports,
Filter Projects by Country
Featured Ports
Featured Port
Able Seaton Port, United Kingdom Image of <%# Eval("PortName") %> Maximum Trenched Depth: 15 m
Entrance Width: 125 m
Spring Tidal Range: 4.6 m
Quay Length: 791 m
Quay Loading Capability: 60 tonnes/m2
Land for Development: 45 ha
More details...



Who is generating power
Who's Generating Power?
1.  United Kingdom - 1858.40 MW
2.  Denmark - 874.48 MW
3.  China - 351.00 MW
More...
Whose Turbines are Generating?
Whose Turbines are Generating?
1.  Siemens Wind Power A/S (Siemens AG) - 1522.00 MW
2.  Vestas Offshore A/S (Vestas Wind Systems A/S) - 1404.12 MW
3.  REpower Systems AG (Suzlon Energy Limited) - 250.00 MW
Loading Map
VesselRoleOrganisationDescriptionCorrect
M/S Honte Vessel-Array Cable Installation(burial) JD-Crafts A/S Supplied the vessel Honte to embed the export cables in 1995 - Client: JD-Contractor A/S More... correct
Henry P. Lading Vessel-Array Cable Installation(cable lay) JD-Crafts A/S Supplied the vessel Henry P. Lading to lay the array cables in 1995 - Client: JD-Contractor A/S More... correct
M/S Honte Vessel-Export Cable Installation(burial) JD-Crafts A/S Supplied the vessel Honte to embed the array cables in 1995 - Client: JD-Contractor A/S More... correct
Henry P. Lading Vessel-Export Cable Installation(cable lay) JD-Crafts A/S Period: 1995
Supplied the vessel Henry P. Lading to lay the export cables in 1995 - Client: JD-Contractor A/S More...
correct
Vessels & Equipment Available for Immediate Charter
Statistics for Tunø Knob
Wind Farm Name Tunø Knob correct
CountryDenmark
Region Odder correct
SeaName Kattegat correct
Centre Latitude 55.968°
Centre Longitude 10.355°
Did you know? Its easy to add a map with this windfarm to your website! More...
Round, tender or call 
Development Status Fully Commissioned correct
Comments on the Status 
Status Documentation
Capacity 5 MW correct
Turbine Capacity 0.5 MW correct
Number of Turbines 10 correct
Turbine Model V39-500kW (Vestas) correct
10 Year Mean Wind Speed (2000-2009) Available online now
Other wind speed data at this location: 6 hr/day/month historic data..., BERR, NERL
(Now incorporating NERL models for USA Projects!)
Weather Forecast Services Weather Solutions For Offshore Wind Power
Rotor Diameter 39 m correct
Total Turbine Height 64.5 m correct
Hub Height 45 m correct
Other comments correct
Foundation Grounded: Gravity-Base correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Area 0 km2
Water Depth Min (Chart Datum) 4 m correct
Water Depth Max (Chart Datum) 7 m correct
Depth range stated by developer correct
Distance From Shore (reported) 5.5 km correct
Distance From Shore (computed from wind farm centre) 5.5 km
Export Cable Length 6 km correct
Infield Cable Length correct
Estimated Infield Cable Length This information is available in the purchased database - please enquire.
Export Cable Capacity correct
Infield Cable Capacity correct
Number of Export Cables correct
Export Cable Type correct
Cable Description correct
Number of Offshore Substations correct
Grid Connection Point correct
Cable Landing Point correct
Annual Capacity Factor correct
Expected Life correct
Estimated Capital Cost (CapEx) This information is available in the purchased database - please enquire.
Stated Project Cost GBP(mill) 9.75 correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Port For Installation Base correct
Port For Ops and Maintenance correct
Number of homes powered annually: 2,796 homes
CO2 Reduced Per Year 5,650 tonnes
SO2 Reduced Per Year 131 tonnes
Website No Website correct

Events on Tunø Knob
DateTypeDescriptionSourceCorrect
1995
Event Type: Operation - Generating Power                                                                                                                                                                                                                                   Operation - Generating Power
Started generating power at some point in 1995. Other correct
1995
Event Type: Installation - Other                                                                                                                                                                                                                                           Installation - Other
Under construction. Visit correct

Please click to add windfarm events via this link, providing approximate date etc. Possible events include consent submission, approval, installation, generating power etc.

Be the first to comment on Tunø Knob offshore wind farm Please note, your comment will take 1 hour to appear.

Your Name * :  
Web Site (optional) : http://  
Comment * :  
* required


Weather Forecast for Tunø Knob More weather tools available on 4C Interactive Map. More weather forecast tools