TGS | Powered by 4C Offshore

4C is now TGS

We are excited to announce a significant milestone in 4C Offshore's journey. Our integration into the TGS family marks the beginning of a new era in offshore wind market intelligence.


Learn what this means for you!

VBMS correct Trianel cable fault

4C Offshore | Lewis Holdsworth
By: Lewis Holdsworth 22/07/2015 VBMS (edited by 4C Offshore)
VBMS completed the repair of an inter-array cable at Trianel Windpark Borkum Phase 1. The scope of work included the removal of the defective cable, and installation, burial, terminations and testing of a replacement cable.  

The experience of the vessel crew with both export and array cable installation over the last 6 years resulted, has in the view of VBMS resulted in the total operation taking less than 48 hours, from arrival to departure. The works were executed in the German Bight by cable-laying vessel Stemat Spirit.

VBMS CEO Arno van Poppel: “We are very pleased that besides installation projects, we are partnering with more and more clients on repair projects. With this cable repair contract, both Trianel and the insurance companies have shown their confidence in VBMS as a total solutions provider.”

Trianel Windpark Borkum Phase 1 consists of 40 M5000-116 Areva turbines and is located 45km from shore.

Premium

4C Offshore Premium, our most popular subscription, gives you full access to use the 4C Offshore WebApp which includes exclusive offshore wind, transmission and vessel reports, news and downloads.

Request a 30 minute Demo

Trending News!