Vendée
580 MW Concept/Early Planning France
Updated weekly to include the latest news, your feedback and other data.
35 Countries, 1173 Windfarms, 7307 Stakeholders, 2711 Events, 161 Vessels, 131 Turbines NEW, 35 Ports,
Filter Projects by Country
Featured Ports
Featured Port
Harwich Navyard, United Kingdom Image of <%# Eval("PortName") %> Maximum Trenched Depth: 8.5 m
Entrance Width:
Spring Tidal Range: 4.8 m
Quay Length: 175 m
Quay Loading Capability:
Land for Development:
More details...



Who is generating power
Who's Generating Power?
1.  United Kingdom - 1858.40 MW
2.  Denmark - 874.48 MW
3.  China - 351.00 MW
More...
Whose Turbines are Generating?
Whose Turbines are Generating?
1.  Siemens Wind Power A/S (Siemens AG) - 1522.00 MW
2.  Vestas Offshore A/S (Vestas Wind Systems A/S) - 1404.12 MW
3.  REpower Systems AG (Suzlon Energy Limited) - 250.00 MW
Loading Map
RoleOrganisationDescription 
Developer wpd Offshore France SAS (wpd Offshore GmbH) correct
Owner wpd Offshore GmbH
Percentage: Subscribe
correct
Vessels & Equipment Available for Immediate Charter
Statistics for Vendée
Wind Farm Name Vendée (also known as Vendee Pont d'Yeu, des Deux Iles) correct
CountryFrance
Region Pays-de-la-Loire correct
SeaName Bay of Biscay correct
Centre Latitude 46.854° (Note: Estimated/Illustrative Location)
Centre Longitude -2.461° (Note: Estimated/Illustrative Location)
Did you know? Its easy to add a map with this windfarm to your website! More...
Round, tender or call2012 Tender
Development Status Concept/Early Planning correct
Comments on the StatusThe French government have ruled out the project for the first tender round. The project may be included in the government's second tender round. The Ministery of the Economy, Finance and Industry indicated an area in the Île de Noirmoutier region would be included in the tender.
Status Documentation
Capacity 580 MW correct
Turbine Capacity 6 MW correct
Number of Turbines 96 correct
Turbine Model Not Decided correct
10 Year Mean Wind Speed (2000-2009) Available online now
Other wind speed data at this location: 6 hr/day/month historic data..., BERR, NERL
(Now incorporating NERL models for USA Projects!)
Weather Forecast Services Weather Solutions For Offshore Wind Power
Rotor Diameter correct
Total Turbine Height correct
Hub Height correct
Other comments correct
Foundation Not Decided correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Area
Water Depth Min (Chart Datum) 17 m correct
Water Depth Max (Chart Datum) 28 m correct
Depth range stated by developer 18 m - 35 m correct
Distance From Shore (reported) 21 km correct
Distance From Shore (computed from wind farm centre)
Export Cable Length correct
Infield Cable Length correct
Estimated Infield Cable Length This information is available in the purchased database - please enquire.
Export Cable Capacity correct
Infield Cable Capacity correct
Number of Export Cables correct
Export Cable Type correct
Cable Description correct
Number of Offshore Substations correct
Grid Connection Point correct
Cable Landing Point correct
Annual Capacity Factor correct
Expected Life correct
Estimated Capital Cost (CapEx) This information is available in the purchased database - please enquire.
Stated Project Cost correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Port For Installation Base correct
Port For Ops and Maintenance correct
Number of homes powered annually: 324,306 homes
CO2 Reduced Per Year 655,423 tonnes
SO2 Reduced Per Year 15,242 tonnes
Website Visit correct

Events on Vendée
DateTypeDescriptionSourceCorrect
Subscribe
Event Type: Installation - Offshore Construction Starts                                                                                                                                                                                                                    Installation - Offshore Construction Starts
Construction to start from Subscribe for projects in the Subscribe tender. Subscribe correct
12-May-2011
Event Type: Planning - Other Approval                                                                                                                                                                                                                                      Planning - Other Approval
The wind farm has been approved by the local government in Vendee. Other correct
Jul-2009
Event Type: Planning - Site Investigation                                                                                                                                                                                                                                  Planning - Site Investigation
Environmental Studies Started Visit correct

Please click to add windfarm events via this link, providing approximate date etc. Possible events include consent submission, approval, installation, generating power etc.

Be the first to comment on Vendée offshore wind farm Please note, your comment will take 1 hour to appear.

Your Name * :  
Web Site (optional) : http://  
Comment * :  
* required


Weather Forecast for Vendée More weather tools available on 4C Interactive Map. More weather forecast tools