Friedrich Ernestine

"A very useful tool to get good reliable information regularly without requiring someone in our organisation to spend a lot of time gathering data."

Neil Clarkson, Windcat Workboats





General Information Name Friedrich Ernestine correct
Other Names Seabreeze 2 correct
Owner RWE Offshore Logistics Company GmbH (OLC) correct
Operator RWE Offshore Logistics Company GmbH (OLC) correct
Vessel Category Heavy Maintenance and Construction
Vessel Description Jack-up vessel correct
Vessel Classification GL ✠100 A5 correct
Maximum Endurance correct
Has Heli Deck? Yes correct
Maximum Working Depth 40 m correct
Flag Germany correct
Subscribe to the Offshore Wind Installation Vessel Database Now !
Build Information Construction Country KR correct
Construction Location Daewoo Shipbuilding & Marine Engineering Co Ltd correct
Year Built 2012 correct
Year Last Converted correct
Date of Delivery 19-Feb-2012 correct
Main Characteristics Length Overall (LOA) 109 m correct
Breadth 40 m correct
Minimum Draft correct
Maximum Draft correct
Accommodation correct
Please enquire below if you are looking for a vessel similar to this.
Speed Transit Speed 6.4 knots correct
Maximum Speed 8.3 knots correct
Cargo Deck Free Deck Space correct
Max. Deck Load correct
Max. Cargo Weigh correct
Max. Transport Capacity correct
Jacking Max Jacking Speed correct
Num Legs 4 correct
Leg Length 78 m correct
Equipment Available for Immediate Charter
Design Criteria Max Operable Significant Wave Height correct
Max Operable Tide Current correct
Max Operable Wind Speed correct
Vessel Identification IMO Number 9578256 correct
Call Sign DIPC2 correct
MMSI 218769000 correct
Positioning Dynamic Positioning (DP) Class 2 correct
DP Notes correct
Subscribe to the Offshore Wind Installation Vessel Database Now !
Cranes First Crane Capacity correct
First Crane Radius correct
First Crane Description correct
Second Crane Capacity correct
Second Crane Radius correct
Second Crane Description correct
Max. Lifting Capacity correct
Notes Further Notes Vessel delayed 6 months due to quality problems with the hydraulic jack-up system. RWE has decided to sell both its installation vessels, the Friedrich Ernestine and the Victoria Mathias by the end of 2013. correct
Operator Website Visit correct
Vessel Spec Visit correct

Contact our vessel specialist about chartering a vessel like this
Your Name *  
Your Email *    
Telephone Number * (include codes)  
Your Organisation *  
Your Job Role *  
To help us identify a suitable vessel please provide a brief description of your requirements. *  
Keep me informed of relevant products and services relating to the offshore wind industry.
 
* required