TGS | Powered by 4C Offshore

4C is now TGS

We are excited to announce a significant milestone in 4C Offshore's journey. Our integration into the TGS family marks the beginning of a new era in offshore wind market intelligence.


Learn what this means for you!

WIND PIONEER

Heavy Maintenance and Construction

4C Offshore | WIND PIONEER
WIND PIONEER is a converted jack-up barge adapted to the offshore wind industry. It designed to operate in challenging seabed conditions such as the UK east coast. With its low draught, it is capable of accessing very shallow and dry out locations.

Following the acquisition of WIND PIONEER by Danish DBB Jack Up Services (now Ziton) in August 2012 the vessel was converted and equipped with new accommodation (37 single cabins) and a new bridge. The vessel delivery was delayed due to issues with the hydraulic system during final commissioning of the crane.

Premium

4C Offshore Premium, our most popular subscription, gives you full access to use the 4C Offshore WebApp which includes exclusive offshore wind, transmission and vessel reports, news and downloads.

Request a 30 minute Demo
General Information
Name
WIND PIONEER
Other Names
Hyundai Pioneer; J/U WIND PIONEER
Operator
Unlock with a freemium account
Vessel Category
Unlock with a freemium account
Vessel Classification
Maximum Endurance
Flag

Build Information
Construction Country
Shipyard
Year Last Converted

Main Characteristics
Length Overall (LOA)
Minimum Draft
Maximum Draft
Passengers

Speed
Transit Speed

Cargo Deck
Free Deck Space
Max. Deck Load
Cargo
Deadweight

Jacking
Max Jacking Speed
Num legs
Leg length

Design Criteria
Max Operable Significant Wave Height
Max. Operable Tide Current

Vessel Identification
Call Sign
IMO Number
MMSI

Positioning
Dynamic Positioning (DP) Class
DP Notes

Cranes
First Crane Capacity
First Crane Radius
First Crane Description
Second Crane Capacity
Second Crane Radius
Second Crane Description
Max. Lifting Capacity

Links
Operator Website
Vessel Spec.