Vindpark Vänern
30 MW Fully Commissioned Sweden
Updated weekly to include the latest news, your feedback and other data.
38 Countries, 1317 Windfarms, 9090 Stakeholders, 4282 Events, 824 Vessels, 153 Turbines NEW, 42 Ports,
Filter Projects by Country
Featured Ports
Featured Port
EastPort UK, United Kingdom Image of <%# Eval("PortName") %> Maximum Trenched Depth: 11 m
Entrance Width: 210 m
Spring Tidal Range: 1.96 m
Quay Length: 1400 m
Quay Loading Capability: 3 tonnes/m2
Land for Development: 12 ha
More details...



Who is generating power
Who's Generating Power?
1.  United Kingdom - 3321.2000 MW
2.  Denmark - 871.4800 MW
3.  China - 559.5000 MW
More...
Whose Turbines are Generating?
Whose Turbines are Generating?
1.  Siemens Wind Power A/S (Siemens AG) - 3084.8000 MW
2.  Vestas Offshore A/S (Vestas Wind Systems A/S) - 1401.1200 MW
3.  REpower Systems AG (Suzlon Energy Limited) - 434.5000 MW
Loading Map
Equipment Available for Charter
Statistics for Vindpark Vänern
General Information Name Vindpark Vänern correct
Other names Gasslingegrund correct
Country name Sweden correct
Region Karlstad Kommun correct
Comments correct
Round (or category) correct
Development status Fully Commissioned correct
Comments on the status correct
Power & Turbines Notice any Errors? You can keep this an open resource by submitting corrections!
Project Capacity 30 MW correct
Turbine Model WWD-3-100 (WinWinD), Dynawind correct
Turbine Capacity 3 MW correct
Number of Turbines 10 correct
Total Turbine Height 140 m correct
Hub Height 90.00 m correct
Rotor Diameter 100 m correct
Foundation Grounded: Gravity-Base correct
Windspeed 10 Year Mean Wind Speed (2000-2009) Available online now
Detailed wind speed data 6 hr/day/month historic data
Costs Stated Project Cost SEK(mill) 540.00 correct
Location & Environment Sea name Vanern Lake correct
Centre latitude 59.262° correct
Centre longitude 13.387° correct
Area 3 km2 correct
Depth range (Chart Datum) 1 m - 22 m correct
Depth range stated by developer 3 m - 13 m correct
Distance From Shore (reported) 3.5 km correct
Distance From Shore (computed from centre) 10.1 km correct
Ports Installation base Karlstad correct
Ops and maintenance correct
Grid Converter platforms None correct
Offshore transformers None correct
Grid connection point Dingelsundet, Karlstad correct
Cable landing point Dingelsundet, Karlstad correct
Export Cables
Please note that export cables connect the offshore transformer (substation) to either; shore or an offshore HVAC-HVDC converter station for onward transmission via HVDC cabling. Please see the converters page for planned converter stations and transmission cables.

The export cable length does not generally include the onshore component. The exception is when the onshore substation is close to shore.
Number of Export Cables correct
Average length per cable correct
Transmission type (e.g. HVAC) correct
Nominal voltage correct
Maximum voltage correct
Power rating correct
Number of cores correct
Conductor type correct
Section correct
Insulation correct
Number fibre optics correct
Minimum bend radius (MBR) correct
Burial depth correct
Comments correct
Onshore Cables (new) Number of onshore cables correct
Average length per cable correct
Comments correct
Array Cables Array cable length correct
Estimated cable length In purchased database
Transmission type (e.g. MVAC) correct
Nominal voltage correct
Maximum voltage correct
Burial depth correct
Number of cores correct
Conductor type correct
Section correct
Insulation correct
Power rating correct
Number of fibre optics correct
Minimum bend radius (MBR) correct
Comments correct
Benefits Homes powered annually 16774 correct
CO2 reduced per year 33901 tonnes correct
SO2 reduced per year 788 tonnes correct
Expected life correct
Other Website Visit correct

Events on Vindpark Vänern
DateTypeDescriptionSourceCorrect
Apr-2012
Event Type: Operation - Service and Maintenance                                                                                                                                                                                                                            Operation - Service and Maintenance
Problems with turbine maintenance have caused mounting production losses. As a consequence, WindWinD struggled to maintain their service agreement due to their poor financial situation. Visit correct
24-May-2010
Event Type: Operation - Generating Power                                                                                                                                                                                                                                   Operation - Generating Power
The wind farm was inaugurated. Visit correct
12-Dec-2009
Event Type: Operation - Fully Commissioned                                                                                                                                                                                                                                 Operation - Fully Commissioned
All turbines operational Visit correct
17-Apr-2009
Event Type: Installation - Turbine Installation                                                                                                                                                                                                                            Installation - Turbine Installation
First tower in place Visit correct
15-Apr-2007
Event Type: Installation - Other                                                                                                                                                                                                                                           Installation - Other
Pre-installation work in progress Visit correct
25-Aug-2006
Event Type: Planning - Consent Authorised                                                                                                                                                                                                                                  Planning - Consent Authorised
All permits held Visit correct

Please click to add windfarm events via this link, providing approximate date etc. Possible events include consent submission, approval, installation, generating power etc.
Comments on Vindpark Vänern offshore wind farm Please note, your comment will take 1 hour to appear.

Your Name * :  
Web Site (optional) : http://  
Comment * :  
* required

Added: Fri, 15 Oct 2010 20:47:00 GMT
A beautiful site, and a beautiful sight! Please look at http://windustrious.org to see the four-year-long effort to bring a freshwater wind farm to Lake Erie, offshore from Cleveland, Ohio. Did the community around Lake Vanern help build the groundswell to support the Wind Park installation? Congratulations on your achievement from across the ocean.