OUtfaHbS-Jo
UK01
%
Barrow offshore wind farm
53.99147165
-3.29596508
http://86.12.156.132/OceanGeo/rest/services/External/windfarm_static/MapServer/export?bbox=-3.65896508%2C53.49147165%2C-2.93296508%2C54.49147165&bboxSR=&layers=&layerdefs=&size=363%2C250&imageSR=&format=jpg&transparent=false&dpi=&f=image
Offshore Wind Database
Offshore Wind News
Market Analysis
Barrow
90 MW
For this wind farm >>>
Who's who
|
Risk Assessment
|
The Facts
|
Your Comments
|
More Analysis...
Interactive Map
|
4C Offshore
|
Contact Us
|
Advertise
For easy analysis you can purchase the Excel version of the Offshore Wind Database .
Available Now: Interactive PDF Maps and Market Analysis Toolkit!
Updated Fridays at 17:00 GMT to include your feedback and new data.
30
Countries,
587
Windfarms,
1679
Stakeholders.
770
Events.
Filter by Country
Show All
Albania
Belgium
Canada
China
Croatia
Denmark
Estonia
Finland
France
Germany
Greece
Ireland
Italy
Japan
Latvia
Lithuania
Maldives
Malta
Netherlands
Norway
Poland
Portugal
Romania
Russia
Spain
Sweden
Taiwan
Tunisia
United Kingdom
United States
1
2
3
4
5
6
7
8
9
10
...
Name
Status
Flag
Depth
Dist.
MW
Siragrunnen
200
SWAY
5
Gimsøy
250
Lofoten Havkraftverk
750
Dafeng Offshore Wind Power Project
500
Stadtvind
1080
Golfo di Manfredonia
297
New Jersey (OCS Block 7033)
350
Rønne Banke V
200
Baie de Seine
300
HEC Offshore Wind Farm
100
Pitkamatala
900
Oulu-Haukipudas
810
Raahe
500
Maakrunnin
390
Laeso
Omo Stalgrunde
Nass & Wind
240
Sandbank 24 extension
200
NYPA Feasible Site 1
1
2
3
4
5
6
7
8
9
10
...
Loading Google Services for Offshore Wind Farm
OceanInsight Sample Risk and Site Reports.
Sample Export Cable
Sample Infield Cable
Sample Wind Turbine
Sample Site Report
Who's Generating Power?
1.
United Kingdom
-
875.60 MW
2.
Denmark
-
626.85 MW
3.
Netherlands
-
246.80 MW
More...
Who's Building Offshore Wind Farms?
1.
United Kingdom
-
1121 MW
2.
Germany
-
448 MW
3.
Belgium
-
330 MW
More...
Whose Turbines are Generating?
1.
Siemens
-
909.20 Turbines
2.
Vestas Offshore AS
-
880.32 Turbines
3.
Bonus energy A/S (Siemens)
-
212.55 Turbines
More...
How much infield cabling is needed for projects that are consented (but not yet under construction) ?
1.
Germany
-
2002 Km
2.
Netherlands
-
884 Km
3.
United Kingdom
-
832 Km
More...
And more ...
How much Infield Cabling will be needed?
Who is laying the foundations?
How deep will the water be?
How long did the consenting process take?
More ...
We welcome your feedback. Have a suggestion? We'd love to hear it.
Location of Barrow
Organisations on Barrow
Database as spreadsheet
Associate your organisation with this wind farm
1
2
3
Organisation
Type
Description
Source
Correct
Mott MacDonald
Designer-Other
Substation designer
Visit
Densit ApS
Contractor-Other
Applied the grout connection between the monopile and the transition piece in 2005.
Visit
KBR
Designer-Foundation
Visit
KBR
Designer-Other
Designed the offshore substation foundations, topsides & the electrical infrastructure, onshore substation & array cables.
Visit
Agrilek Ltd
Contractor-Other
Fitted-out the electrical components for the offshore substation.
Visit
Vuyk Engineering Rotterdam B.V.
Supplier-Vessel
Supplied the vessel the Matador 3 for the installation of the offshore substation.
Visit
AREVA
Designer-Other
Designed the electrical components for the offshore substation.
Visit
Stemat Marine Services
Supplier-Vessel
Supplied the Pontramantis vessel for the export cable lay.
Visit
MPI Offshore Ltd
Supplier-Vessel
Supplied the Resolution for the turbine and foundation installation.
Visit
MPI Offshore Ltd
Installer-Foundation
Visit
1
2
3
OceanInsight: Barrow Site & Risk Assessment Reports
4C Offshore offer a comprehensive range of
risk assessment products
and
services
which help offshore projects reduce their exposure to risk.
4C's OceanInsight reports capture the range of risks associated with the Offshore Wind Farm's project environment. Risk ratings for different activities on Barrow are shown below. The range covered by the box captures the variation in the project environment.
Infrastructure
Risk of performing Activity relative to Other Offshore Wind Farms
Report
Installation / Decommissioning
Operations and Maintenance
Repair
Export Cabling
Loading...
Loading...
Loading...
Array (Infield) Cabling
Loading...
Loading...
Loading...
Turbines
Loading...
Loading...
Loading...
Overview Site Report for Barrow
New!
Overview Site Report For Barrow.
Approximately 25 pages of essential background information for the offshore wind farm site and cable route.
Statistics for Barrow
Database as spreadsheet
Associate your organisation with this wind farm
Wind Farm Name
Barrow
Other Names
Country
United Kingdom
Region
North West
Centre Latitude
53.99°
Centre Longitude
-3.3°
Round (UK Only)
1
Development Status
Generating Power
Comments on the Status
Generating since March 2006
Status Documentation
Capacity
90 MW
Current Capacity (if generating)
90 MW
Turbine Capacity
3 MW
Number of Turbines
30
Turbine Model
Vestas V90-3.0 MW
Average Annual Wind Speed
This information is available in a separate database - please enquire.
Rotor Diameter
90 m
Total Turbine Height
120 m
Hub Height
75 m
Other comments on this data
Foundation
Monopile
Surface Sediment / Ground Conditions
This information is available in a separate database - please enquire.
Notice any Errors?
Please help keep this an open and free resource by submitting corrections.
Area
10 Km2
Water Depth Min
12 m
Water Depth Max
16 m
Distance From Shore (reported)
7.5 km
Distance From Shore (computed from wind farm centre)
12.8 km
Export Cable Length
26 km
Infield Cable Length
22 km
Estimated Infield Cable Length
This information is available in the purchased database - please enquire.
Export Cable Capacity
145 kV
Infield Cable Capacity
33 kV
Number of Export Cables
1
Export Cable Type
XLPE Submarine Cable
Cable Description
Number of Offshore Substations
1
Grid Connection Point
Heysham
Cable Landing Point
Heysham
Soil Types
very loose silty sands to stiff gravely clays with numerous troublesome cobbles
Annual Capacity Factor
Expected Life
20 years
Estimated Capital Cost (CapEx)
This information is available in the purchased database - please enquire.
Stated Project Cost
GBP(mill) 139.50
Notice any Errors?
Please help keep this an open and free resource by submitting corrections.
Jobs Created
Port For Installation Base
Belfast
Port For Ops and Maintenance
Number of homes powered annually:
50323 homes
CO2 Reduced Per Year
101704 tonnes
SO2 Reduced Per Year
2365 tonnes
Website
Visit
Events on Barrow
Database as spreadsheet
Associate your organisation with this wind farm
Date
Type
Description
Source
Correct
Jun-2006
Installation - Final Testing
Final testing finishes.
Visit
Apr-2006
Installation - Cable installation
Offshore cable installation finishes.
Visit
Mar-2006
Installation - Final Testing
Final testing starts.
Visit
Mar-2006
Operation - Generating Power
Generating Power
Visit
Sep-2005
Installation - Turbine Installation
Turbine installation finishes.
Visit
Jul-2005
Installation - Cable installation
Offshore cable installation starts.
Visit
Jul-2005
Installation - Turbine Installation
Turbine installation starts.
Visit
Jun-2005
Installation - Foundation Installation
Foundation installation finishes.
Visit
Apr-2005
Installation - Foundation Installation
Foundation installation starts.
Visit
2003
Planning - Consent Authorised
Visit
Please click to add windfarm events via this link, providing approximate date etc. Possible events include consent submission, approval, installation, generating power etc.
Comments on Barrow offshore wind farm
Your Name *
:
Web Site (optional)
:
http://
Comment *
:
* required
Added:
Wed, 07 Oct 2009 17:43:00 GMT
Hai. Good Site
Ravi
<< Newer Comments
Older Comments >>
Weather Forecast for Barrow
More weather tools available on 4C Interactive Map.