Ormonde
150 MW Fully Commissioned United Kingdom
Updated weekly to include the latest news, your feedback and other data.
38 Countries, 1323 Windfarms, 9111 Stakeholders, 4314 Events, 824 Vessels, 154 Turbines NEW, 42 Ports,
Filter Projects by Country
Featured Ports
Featured Port
Harwich Navyard, United Kingdom Image of <%# Eval("PortName") %> Maximum Trenched Depth: 8.5 m
Entrance Width:
Spring Tidal Range: 4.8 m
Quay Length: 175 m
Quay Loading Capability:
Land for Development:
More details...



Who is generating power
Who's Generating Power?
1.  United Kingdom - 3321.2000 MW
2.  Denmark - 871.4800 MW
3.  China - 559.5000 MW
More...
Whose Turbines are Generating?
Whose Turbines are Generating?
1.  Siemens Wind Power A/S (Siemens AG) - 3084.8000 MW
2.  Vestas Offshore A/S (Vestas Wind Systems A/S) - 1401.1200 MW
3.  REpower Systems AG (Suzlon Energy Limited) - 434.5000 MW
Loading Map
Equipment Available for Charter
Statistics for Ormonde
General Information Name Ormonde correct
Other names correct
Country name United Kingdom correct
Region England, North West correct
Comments Gas field production licence handed back to DECC as it was not economically viable. correct
Round (or category) Gas-Wind Hybrid correct
Development status Fully Commissioned correct
Comments on the status The site was officially inaugurated on 19 September 2012. correct
Power & Turbines Notice any Errors? You can keep this an open resource by submitting corrections!
Project Capacity 150 MW correct
Turbine Model 5M (REpower) correct
Turbine Capacity 5.08 MW correct
Number of Turbines 30 correct
Total Turbine Height 163 m correct
Hub Height 100.00 m correct
Rotor Diameter 126 m correct
Foundation Grounded: Jacket correct
Windspeed 10 Year Mean Wind Speed (2000-2009) Available online now
Detailed wind speed data 6 hr/day/month historic data
Costs Stated Project Cost EUR(mill) 552.00 correct
Location & Environment Sea name Irish Sea (Irish Sea) correct
Centre latitude 54.088° correct
Centre longitude -3.437° correct
Area 10 km2 correct
Depth range (Chart Datum) 17 m - 21 m correct
Depth range stated by developer 17 m - 22 m correct
Distance From Shore (reported) 9.5 km correct
Distance From Shore (computed from centre) 12.3 km correct
Ports Installation base Belfast correct
Ops and maintenance Barrow correct
Grid Converter platforms None correct
Offshore transformers Ormonde Substation correct
Grid connection point Heysham correct
Cable landing point North of Heysham Port in Half Moon Bay correct
Export Cables
Please note that export cables connect the offshore transformer (substation) to either; shore or an offshore HVAC-HVDC converter station for onward transmission via HVDC cabling. Please see the converters page for planned converter stations and transmission cables.

The export cable length does not generally include the onshore component. The exception is when the onshore substation is close to shore.
Number of Export Cables 1 correct
Average length per cable 42 km correct
Transmission type (e.g. HVAC) HVAC correct
Nominal voltage 132 kV correct
Maximum voltage correct
Power rating 158 MVA correct
Number of cores 3 correct
Conductor type Cu correct
Section 630 mm2 correct
Insulation XLPE correct
Number fibre optics 24 correct
Minimum bend radius (MBR) 3 m correct
Burial depth 2 m correct
Comments 32m£ have been spent on export cable supply and installation correct
Onshore Cables (new) Number of onshore cables 3 correct
Average length per cable 2.8 km correct
Comments 3 underground single core cables, 132kV, 157MVA. Buried to a depth of 0.9m. correct
Array Cables Array cable length 25 km correct
Estimated cable length In purchased database
Transmission type (e.g. MVAC) MVAC correct
Nominal voltage 33 kV correct
Maximum voltage correct
Burial depth correct
Number of cores 3 correct
Conductor type Cu correct
Section 150/300/500 mm2 correct
Insulation XLPE correct
Power rating correct
Number of fibre optics 24 correct
Minimum bend radius (MBR) correct
Comments Prysmian 33kV submarine composite cables - (3x 500m2)(3x300m2)(3x150mm2) correct
Benefits Homes powered annually 83872 correct
CO2 reduced per year 169506 tonnes correct
SO2 reduced per year 3942 tonnes correct
Expected life 25.0 years correct
Other Website Visit correct

Events on Ormonde
12
DateTypeDescriptionSourceCorrect
19-Sep-2012
Event Type: Installation - Other                                                                                                                                                                                                                                           Installation - Other
Ormonde was officially opened by Vattenfall. The event was attended by MP John Woodcock, the local member of Parliament. Visit correct
12-Jun-2012
Event Type: Installation - Other                                                                                                                                                                                                                                           Installation - Other
Rock dumping on the cables finished. Rock dumping was undertaken where extended surveys showed some stretches of cable to be inadequately buried despite several attempts with plough, jetting etc . Visit correct
22-Feb-2012
Event Type: Operation - Fully Commissioned                                                                                                                                                                                                                                 Operation - Fully Commissioned
The wind farm was fully commissioned. Visit correct
18-Jan-2012
Event Type: Operation - Generating Power                                                                                                                                                                                                                                   Operation - Generating Power
As of this date 120MW was operational. Visit correct
05-Dec-2011
Event Type: Operation - Generating Power                                                                                                                                                                                                                                   Operation - Generating Power
22 of the 30 turbines were commissioned. Other correct
18-Aug-2011
Event Type: Operation - Generating Power                                                                                                                                                                                                                                   Operation - Generating Power
The first turbine produced power on this date. Visit correct
Aug-2011
Event Type: Installation - Turbine Installation                                                                                                                                                                                                                            Installation - Turbine Installation
Turbine installation at the site was finished. Visit correct
26-Apr-2011
Event Type: Installation - Cable installation                                                                                                                                                                                                                              Installation - Cable installation
The export cable installation finished. Visit correct
26-Apr-2011
Event Type: Installation - Cable installation                                                                                                                                                                                                                              Installation - Cable installation
Export cable installation was completed. Visit correct
04-Apr-2011
Event Type: Installation - Turbine Installation                                                                                                                                                                                                                            Installation - Turbine Installation
The first turbine was installed. Visit correct
12

Please click to add windfarm events via this link, providing approximate date etc. Possible events include consent submission, approval, installation, generating power etc.
Comments on Ormonde offshore wind farm Please note, your comment will take 1 hour to appear.

Your Name * :  
Web Site (optional) : http://  
Comment * :  
* required

Added: Mon, 08 Mar 2010 09:50:00 GMT
The Rotor Diameter is 126m for the REpower 5M turbine. Correction will be visible on this page shortly. Thank you for bringing this error to our attention.