Celtic Array South West Potential Development Area
1,000 MW Cancelled United Kingdom

"We are using the reports extensively and have built an updated business plan."

Haico Halbesma, Oceanteam Shipping

Latest Windfarm News
Cape Wind signs lease for New Bedford staging area
The Republican - masslive.com
NEW BEDFORD - Announcing a lease deal with Cape Wind, state officials expect the offshore wind farm developers, who are still fighting lawsuits and assembling financing, to begin operations at the South Coast Marine Terminal in New Bedford in January.
Source: news.google.com
16/09/2014 02:31:07

Wind turbines kill fewer birds than cats, cell towers
9NEWS.com
Wind turbines kill between 214,000 and 368,000 birds annually — a small fraction compared with the estimated 6.8 million fatalities from collisions with cell and radio towers and the 1.4 billion to 3.7 billion deaths from cats, according to the peer-reviewed ...
Source: news.google.com
16/09/2014 02:17:39

Scottish vote may freeze 5.7GW-plus in wind
Business Spectator
The Contract-for-Difference, or CfD, support scheme is currently being phased in, and in April the 664MW Beatrice offshore wind project in Scottish waters, costing an estimated $3.4 billion*, was selected by the UK Department of Energy and Climate Change ...
Source: news.google.com
16/09/2014 00:46:51

Chafee sees state as future leader in wind energy
Charlotte Observer
PROVIDENCE, R.I. Rhode Island will have a major role to play in the offshore wind industry, even though a developer chose to use a Massachusetts port to build a large wind farm, Gov. Lincoln Chafee said Monday. Rhode Island officials had hoped Cape ...
Source: news.google.com
15/09/2014 22:00:11

Iberdrola SA (IBE)'s ScottishPower unit is nearing completion of a 389-megawatt...
Mynextfone
Iberdrola Nears Completion of $2.6 Billion Offshore Wind Farm. Iberdrola SA (IBE)'s ScottishPower unit is nearing completion of a 389-megawatt offshore wind project. The 1.6 billion-pound ($2.6 billion) wind farm will be ready to start full commercial ...
Source: news.google.com
15/09/2014 17:34:45

Report concludes that Bicker Fen best option
Sleaford Today
RWE Innogy has published a report outlining the results of a study undertaken with National Grid which they say clearly highlights why a location at Bicker Fen overlooking Little Hale is the best option to connect the proposed Triton Knoll offshore wind farm to ...
Source: news.google.com
15/09/2014 17:32:11

U.K.'s first two-bladed offshore wind turbine approved for Scotland
High Performance Composites
Two-bladed designs at this scale are a major innovation for the offshore wind industry and the deployment offshore of these 6 MW turbines at Methil will be the first in the world of their kind. 2-B Energy has received grant support from the Department of Energy ...
Source: news.google.com
15/09/2014 17:19:27

Cape Wind offshore renewable energy project to be built in New Bedford
PennEnergy (press release)
NEW BEDFORD, Mass. (AP) — The developers of a proposed wind farm off the coast of Cape Cod have signed a lease agreement with the state to use New Bedford for staging and construction of the 130-turbine project, officials announced Friday. Gov.
Source: news.google.com
15/09/2014 16:01:28

RES Offshore wins Moray Firth development contract
Renewable Energy Focus
RES Offshore, part of the RES Group, has more than 15 years' experience in offshore wind development having worked on the development of over 5,000 MW of which more than 350MW has been successfully consented and is now in operation.
Source: news.google.com
15/09/2014 15:44:23



map not available
Developers/Owners/Operators
Project Details for Celtic Array South West Potential Development Area
General Information Name Celtic Array South West Potential Development Area correct
Other names Zone 9, Irish Sea correct
Country name United Kingdom correct
Region Wales, North correct
Comments July 2014 The Crown Estate invited all Round 3 developers to revise the terms of their agreement as the projects transition from zone appraisals to project development. This could mean that zone development agreements are replaced with project specific contractural agreements. correct
Round (or category) Round 3 correct
Development status Cancelled correct
Comments on the status Cancellation - The developers, Centrica and DONG, and the Crown Estate have agreed that the developers will cease development on the entire zone and terminate their seabed rights. The assessment of the zone has shown challenging ground conditions which using current technology make the project economically unviable. There are no plans to re-offer the zone to the market.

This potential development area (PDA) may be developed following the North East PDA and may be divided into 2x500MW projects.

Current efforts are being focused on Rhiannon Wind Farm, and examining the potential for development in the North East PDA.
correct
Power & Turbines Notice any Errors? You can keep this an open resource by submitting corrections!
Project Capacity 1,000 MW correct
Turbine Model Not Decided correct
Turbine Capacity correct
Number of Turbines correct
Total Turbine Height correct
Hub Height correct
Rotor Diameter correct
Foundation Not Decided correct
Windspeed 10 Year Mean Wind Speed (2000-2009) Available online now
Detailed wind speed data 6 hr/day/month historic data
Costs Stated Project Cost correct
Location & Environment Sea name Irish Sea (Irish Sea) correct
Centre latitude 53.677° correct
Centre longitude -4.875° correct
Area 267 km2 correct
Depth range (Chart Datum) 32 m - 69 m correct
Depth range stated by developer correct
Distance From Shore (reported) 15 km correct
Distance From Shore (computed from centre) 37.6 km correct
Ports Installation base correct
Ops and maintenance correct
Grid Converter platforms correct
Offshore transformers correct
Grid connection point correct
Cable landing point correct
Export Cables
Please note that export cables connect the offshore transformer (substation) to either; shore or an offshore HVAC-HVDC converter station for onward transmission via HVDC cabling. Please see the converters page for planned converter stations and transmission cables.

The export cable length does not generally include the onshore component. The exception is when the onshore substation is close to shore.
Number of Export Cables correct
Average length per cable correct
Transmission type (e.g. HVAC) correct
Nominal voltage correct
Maximum voltage correct
Power rating correct
Number of cores correct
Conductor type correct
Section Area correct
Insulation correct
Number fibre optics correct
Export minimum bend radius (MBR) correct
Burial depth correct
Comments correct
Onshore Cables Number of onshore cables correct
Average length per cable correct
Comments correct
Array Cables Array cable length correct
Estimated cable length LogIn
Transmission type (e.g. MVAC) correct
Nominal voltage correct
Maximum voltage correct
Burial depth correct
Number of cores correct
Conductor type correct
Section correct
Insulation correct
Power rating correct
Number of fibre optics correct
Minimum bend radius (MBR) correct
Comments correct
Benefits Homes powered annually 652340 correct
CO2 reduced per year 1318380 tonnes correct
SO2 reduced per year 30660 tonnes correct
Expected life correct
Other Website Visit correct