Walney Phase 1
183.6 MW Fully Commissioned United Kingdom
Updated weekly to include the latest news, your feedback and other data.
38 Countries, 1323 Windfarms, 9111 Stakeholders, 4314 Events, 824 Vessels, 154 Turbines NEW, 42 Ports,
Filter Projects by Country
Featured Ports
Featured Port
Harwich Navyard, United Kingdom Image of <%# Eval("PortName") %> Maximum Trenched Depth: 8.5 m
Entrance Width:
Spring Tidal Range: 4.8 m
Quay Length: 175 m
Quay Loading Capability:
Land for Development:
More details...



Who is generating power
Who's Generating Power?
1.  United Kingdom - 3321.2000 MW
2.  Denmark - 871.4800 MW
3.  China - 559.5000 MW
More...
Whose Turbines are Generating?
Whose Turbines are Generating?
1.  Siemens Wind Power A/S (Siemens AG) - 3084.8000 MW
2.  Vestas Offshore A/S (Vestas Wind Systems A/S) - 1401.1200 MW
3.  REpower Systems AG (Suzlon Energy Limited) - 434.5000 MW
Loading Map
RoleOrganisationDescription 
Developer Walney (UK) Offshore Windfarms Ltd DONG Energy (50.1%), Scottish & Southern Energy (25.1%) and a consortium of PGGM and Dutch Ampère Equity Fund, managed by Triodos Investment Management (24.8%) are the companies behind Walney (UK) Offshore Windfarms Limited. DONG Energy is and will be the leading partner in the construction and operational phases of the Walney Offshore Windfarm correct
Operator Walney (UK) Offshore Windfarms Ltd DONG Energy (50.1%), Scottish & Southern Energy (25.1%) and a consortium of PGGM and Dutch Ampère Equity Fund, managed by Triodos Investment Management (24.8%) are the companies behind Walney (UK) Offshore Windfarms Limited. DONG Energy is and will be the leading partner in the construction and operational phases of the Walney Offshore Windfarm correct
Owner Ampère Equity Fund (Triodos Bank) A consortium of PGGM and Dutch Ampère Equity Fund, managed by Triodos Investment Management, have entered into an agreement with DONG Energy whereby the consortium acquires a 24.8% stake. DONG Energy will retain a 50.1% stake and SSE will retain the 25.1% stake it acquired from DONG Energy in December 2009.
Update: In December 2012, OPW (the PGGM and Ampere JV) refinances its 24.8% stake. Refinance provided by consortium of five banks providing senior debt of GBP 224m (GBP 45m coming from new UK Green Investment Bank)

Value: Subscribe
Percentage: Subscribe
correct
Owner DONG Wind (UK) Limited (DONG Energy) 50.1% Stake
Percentage: Subscribe
correct
Owner Scottish and Southern Energy (SSE) Bought 25.1% share in Walney project from DONG Energy.
Value: Subscribe
Percentage: Subscribe
correct
Owner PGGM A consortium of PGGM and Dutch Ampère Equity Fund, managed by Triodos Investment Management, have entered into an agreement with DONG Energy whereby the consortium acquires a 24.8% stake. DONG Energy will retain a 50.1% stake and SSE will retain the 25.1% stake it acquired from DONG Energy in December 2009.
Update: In December 2012, OPW (the PGGM and Ampere JV) refinances its 24.8% stake. Refinance provided by consortium of five banks providing senior debt of GBP 224m (GBP 45m coming from new UK Green Investment Bank)

Value: Subscribe
Percentage: Subscribe
correct
Owner-Offshore Transmission Blue Transmission Walney 1 Limited Mitsubishi Corporation acquired a 50% share of the transmission assets for Walney 1 offshore wind farm for undisclosed sum. The acquisition was made from the Macquarie Capital Group. Following the transaction Barclays and Mitsubishi each own 50%.
Financial close and licence granted 21 Oct 20122

Value: Subscribe
correct
Equipment Available for Charter
Statistics for Walney Phase 1
General Information Name Walney Phase 1 correct
Other names correct
Country name United Kingdom correct
Region England, North West correct
Comments Cost is for the two sites (Walney 1 and 2) and excludes cost of connection to grid. The assessed transfer value of the Walney 1 project transmission assets is £105,411,350.
Project uses the met mast at Cirrus Shell Flats
correct
Round (or category) Round 2 correct
Development status Fully Commissioned correct
Comments on the status correct
Power & Turbines Notice any Errors? You can keep this an open resource by submitting corrections!
Project Capacity 183.6 MW correct
Turbine Model SWT-3.6-107 (Siemens) correct
Turbine Capacity 3.6 MW correct
Number of Turbines 51 correct
Total Turbine Height 137 m correct
Hub Height 83.50 m correct
Rotor Diameter 107 m correct
Foundation Grounded: Monopile correct
Windspeed 10 Year Mean Wind Speed (2000-2009) Available online now
Detailed wind speed data 6 hr/day/month historic data
Costs Stated Project Cost GBP(mill) 500.00 correct
Location & Environment Sea name Irish Sea (Irish Sea) correct
Centre latitude 54.041° correct
Centre longitude -3.514° correct
Area 28 km2 correct
Depth range (Chart Datum) 19 m - 23 m correct
Depth range stated by developer 19 m - 28 m correct
Distance From Shore (reported) 14 km correct
Distance From Shore (computed from centre) 19.4 km correct
Ports Installation base Barrow and Mostyn correct
Ops and maintenance Barrow correct
Grid Converter platforms None correct
Offshore transformers Walney Phase 1 Substation correct
Grid connection point Heysham correct
Cable landing point Heysham correct
Export Cables
Please note that export cables connect the offshore transformer (substation) to either; shore or an offshore HVAC-HVDC converter station for onward transmission via HVDC cabling. Please see the converters page for planned converter stations and transmission cables.

The export cable length does not generally include the onshore component. The exception is when the onshore substation is close to shore.
Number of Export Cables 1 correct
Average length per cable 43 km correct
Transmission type (e.g. HVAC) HVAC correct
Nominal voltage 132 kV correct
Maximum voltage correct
Power rating 192 MVA correct
Number of cores 3 correct
Conductor type Cu correct
Section 630 mm2 correct
Insulation XLPE correct
Number fibre optics 48 correct
Minimum bend radius (MBR) 3 m correct
Burial depth 2 m correct
Comments Diameter 209mm, non-coilable correct
Onshore Cables (new) Number of onshore cables 3 correct
Average length per cable 2.7 km correct
Comments 3 single core, 132kV, 192MVA correct
Array Cables Array cable length 46 km correct
Estimated cable length In purchased database
Transmission type (e.g. MVAC) MVAC correct
Nominal voltage 33 kV correct
Maximum voltage correct
Burial depth 2 m correct
Number of cores 3 correct
Conductor type Cu correct
Section 150/500 mm2 correct
Insulation correct
Power rating correct
Number of fibre optics 40 correct
Minimum bend radius (MBR) correct
Comments ICC: 3 x 150 mm2, 33 kV + fibre optic cable (16 fibres). PCC: 3 x 500 mm2, 33 kV + fibre optic cable (24 fibres).  correct
Benefits Homes powered annually 102660 correct
CO2 reduced per year 207475 tonnes correct
SO2 reduced per year 4825 tonnes correct
Expected life 20.0 years correct
Other Website Visit correct

Events on Walney Phase 1
1234
DateTypeDescriptionSourceCorrect
23-May-2013
Event Type: Operation - Service and Maintenance                                                                                                                                                                                                                            Operation - Service and Maintenance
The replacement array cable has been installed and jetting work to bury it took place late May. Other correct
11-Apr-2013
Event Type: Operation - Service and Maintenance                                                                                                                                                                                                                            Operation - Service and Maintenance
Remedial work to array cabling started. Visit correct
20-Dec-2012
Event Type: Planning - Financing Agreement                                                                                                                                                                                                                                 Planning - Financing Agreement
OPW (the PGGM and Ampere JV) refinances its 24.8% stake. Refinance provided by consortium of five banks providing senior debt of GBP 224m (GBP 45m coming from new UK Green Investment Bank) Visit correct
Jul-2012
Event Type: Operation - Service and Maintenance                                                                                                                                                                                                                            Operation - Service and Maintenance
Rock dumping was carried out around each turbine foundation for scour protection. Visit correct
12-Jul-2011
Event Type: Operation - Fully Commissioned                                                                                                                                                                                                                                 Operation - Fully Commissioned
The project became fully operational. Visit correct
30-May-2011
Event Type: Operation - Generating Power                                                                                                                                                                                                                                   Operation - Generating Power
All turbines are producing power. Visit correct
11-Apr-2011
Event Type: Planning - Financing Agreement                                                                                                                                                                                                                                 Planning - Financing Agreement
Statkraft signed a Power Purchase Agreement (PPA) with DONG for half of the power from Burbo Bank, Gunfleet Sands, Walney & London Array. Visit correct
Feb-2011
Event Type: Installation - Cable installation                                                                                                                                                                                                                              Installation - Cable installation
All the array cables have been placed and connected to the turbines. Visit correct
13-Jan-2011
Event Type: Operation - Generating Power                                                                                                                                                                                                                                   Operation - Generating Power
The wind farm produced power for the first time. Visit correct
06-Jan-2011
Event Type: Installation - Turbine Installation                                                                                                                                                                                                                            Installation - Turbine Installation
Turbine installation complete. Visit correct
1234

Please click to add windfarm events via this link, providing approximate date etc. Possible events include consent submission, approval, installation, generating power etc.