Celtic Array North East Potential Development Area
1,000 MW Cancelled United Kingdom

"4C provides regular updates of in-depth data relative to our needs."

Reef Subsea


Latest Windfarm News
RWE talks shop on Triton grid
reNews
RWE has unwrapped the blueprint for community consultations on the onshore electrical works for its proposed up to 900MW Triton Knoll offshore wind farm in the east of England. Adverts have been placed in local newspapers in Lincolnshire containing the ...
Source: news.google.com
17/09/2014 06:04:32

Harnessing the wind
Sequim Gazette
William Shaw, atmospheric chemistry and meteorology scientist for Pacific Northwest National Laboratory, explains the technologically advanced and distinct instruments each buoy is equipped with to gather unique off-shore wind energy data in the open ...
Source: news.google.com
16/09/2014 23:51:34

Canada falls behind global growth of offshore wind power: report
The Globe and Mail
Currently, Britain has the most offshore wind farms of any country, with about half of the worldwide capacity. While it will see more installed in the next few years – reaching 11 GW by 2020 – Britain's worldwide share will decrease to less than 30 per cent, the ...
Source: news.google.com
16/09/2014 22:06:18

A Million-Dollar Buoy Will Spot the Best Sites for Wind Farms
Gizmodo India
With roughly 12,383 miles of coastline, the US has plenty of potential installation sites for offshore wind farms. Floating data collection centers like the one shown above will help energy companies and government agencies alike find the windiest, and most ...
Source: news.google.com
16/09/2014 19:55:23

Gov. Sees State as Future Leader in Wind Energy
Product Design & Development
Rhode Island will have a major role to play in the offshore wind industry, even though a developer chose to use a Massachusetts port to build a large wind farm, Gov. Lincoln Chafee said Monday. Rhode Island officials had hoped Cape Wind would use New ...
Source: news.google.com
16/09/2014 15:06:18

New Series: Brave Tern - Working on the edge (episode 1)
Deutsche Welle
Do German offshore wind farms have a future? 03.04.2013. Often hailed as the showpiece of German efforts to promote renewable energy, until recently there was general approval for the country's offshore wind farms. Now, however, the policy is falling out of ...
Source: news.google.com
16/09/2014 17:56:05

Wind Energy O&M Market Global Research and Analysis 2018
DigitalJournal.com
Good O&M practices can optimize the profitability of wind farms, thereby ultimately reducing the downtime of the turbines or leading to the extension of their lifespan. O&M also tends to be high for offshore wind energy systems compared to the terrestrial wind ...
Source: news.google.com
16/09/2014 18:05:55

Cape Wind Signs Lease For New Bedford Staging Area
Banker & Tradesman
Announcing a lease deal with Cape Wind, state officials expect the offshore wind farm developers, who are still fighting lawsuits and assembling financing, to begin operations at the South Coast Marine Terminal in New Bedford in January 2015. The Mass ...
Source: news.google.com
16/09/2014 15:52:57

Volvo Penta Turns the Tide for Njord Offshore
The Maritime Executive
After initially being designed to accommodate a different propulsion system, Njord Offshore's four new windfarm crew vessels are all fitted with Volvo Penta IPS900 and will be in the water by early 2015. Volvo Penta exhibited its offshore windfarm solutions at ...
Source: news.google.com
16/09/2014 15:37:32



map not available
Developers/Owners/Operators
Project Details for Celtic Array North East Potential Development Area
General Information Name Celtic Array North East Potential Development Area correct
Other names Zone 9, Irish Sea correct
Country name United Kingdom correct
Region Wales, North correct
Comments July 2014 The Crown Estate invited all Round 3 developers to revise the terms of their agreement as the projects transition from zone appraisals to project development. This could mean that zone development agreements are replaced with project specific contractural agreements. correct
Round (or category) Round 3 correct
Development status Cancelled correct
Comments on the status Cancellation - The developers, Centrica and DONG, and the Crown Estate have agreed that the developers will cease development on the entire zone and terminate their seabed rights. The assessment of the zone has shown challenging ground conditions which using current technology make the project economically unviable. There are no plans to re-offer the zone to the market.

Developer distance from shore and average length of the export cable are based on the whole zone.

This potential development area (PDA) will be developed following Rhiannon and will be divided into 2x500MW projects.

A proposal for the zone development is expected following detailed assessments of the potential impact on shipping, particularly services to the Isle of Man.
correct
Power & Turbines Notice any Errors? You can keep this an open resource by submitting corrections!
Project Capacity 1,000 MW correct
Turbine Model Not Decided correct
Turbine Capacity correct
Number of Turbines correct
Total Turbine Height correct
Hub Height correct
Rotor Diameter correct
Foundation Not Decided correct
Windspeed 10 Year Mean Wind Speed (2000-2009) Available online now
Detailed wind speed data 6 hr/day/month historic data
Costs Stated Project Cost correct
Location & Environment Sea name Irish Sea (Irish Sea) correct
Centre latitude 53.961° correct
Centre longitude -4.119° correct
Area 358 km2 correct
Depth range (Chart Datum) 28 m - 44 m correct
Depth range stated by developer correct
Distance From Shore (reported) 15 km correct
Distance From Shore (computed from centre) 57.7 km correct
Ports Installation base correct
Ops and maintenance correct
Grid Converter platforms correct
Offshore transformers correct
Grid connection point correct
Cable landing point correct
Export Cables
Please note that export cables connect the offshore transformer (substation) to either; shore or an offshore HVAC-HVDC converter station for onward transmission via HVDC cabling. Please see the converters page for planned converter stations and transmission cables.

The export cable length does not generally include the onshore component. The exception is when the onshore substation is close to shore.
Number of Export Cables correct
Average length per cable correct
Transmission type (e.g. HVAC) correct
Nominal voltage correct
Maximum voltage correct
Power rating correct
Number of cores correct
Conductor type correct
Section Area correct
Insulation correct
Number fibre optics correct
Export minimum bend radius (MBR) correct
Burial depth correct
Comments correct
Onshore Cables Number of onshore cables correct
Average length per cable correct
Comments correct
Array Cables Array cable length correct
Estimated cable length LogIn
Transmission type (e.g. MVAC) correct
Nominal voltage correct
Maximum voltage correct
Burial depth correct
Number of cores correct
Conductor type correct
Section correct
Insulation correct
Power rating correct
Number of fibre optics correct
Minimum bend radius (MBR) correct
Comments correct
Benefits Homes powered annually 652340 correct
CO2 reduced per year 1318380 tonnes correct
SO2 reduced per year 30660 tonnes correct
Expected life correct
Other Website Visit correct