roll
Yttre Stengrund
10 MW Fully Commissioned Sweden
Updated weekly to include the latest news, your feedback and other data.
38 Countries, 1323 Windfarms, 9111 Stakeholders, 4314 Events, 824 Vessels, 154 Turbines NEW, 42 Ports,
Filter Projects by Country
Featured Ports
Featured Port
Great Yarmouth - Fendercare Marine Equipment & Lifting Services, United Kingdom Image of <%# Eval("PortName") %> Maximum Trenched Depth: 5 m
Entrance Width: 26.7 m
Spring Tidal Range:
Quay Length: 50 m
Quay Loading Capability: 250 tonnes/m2
Land for Development:
More details...



Who is generating power
Who's Generating Power?
1.  United Kingdom - 3321.2000 MW
2.  Denmark - 871.4800 MW
3.  China - 559.5000 MW
More...
Whose Turbines are Generating?
Whose Turbines are Generating?
1.  Siemens Wind Power A/S (Siemens AG) - 3084.8000 MW
2.  Vestas Offshore A/S (Vestas Wind Systems A/S) - 1401.1200 MW
3.  REpower Systems AG (Suzlon Energy Limited) - 434.5000 MW
Loading Map
Equipment Available for Charter
Statistics for Yttre Stengrund
General Information Name Yttre Stengrund correct
Other names correct
Country name Sweden correct
Region Karlskrona Kommun correct
Comments correct
Round (or category) correct
Development status Fully Commissioned correct
Comments on the status Intend to repower the project using 5 new turbines but keeping the original foundations. correct
Power & Turbines Notice any Errors? You can keep this an open resource by submitting corrections!
Project Capacity 10 MW correct
Turbine Model NM 72/2000 (NEG Micon ) correct
Turbine Capacity 2 MW correct
Number of Turbines 5 correct
Total Turbine Height 96 m correct
Hub Height 60.00 m correct
Rotor Diameter 72 m correct
Foundation Grounded: Monopile correct
Windspeed 10 Year Mean Wind Speed (2000-2009) Available online now
Detailed wind speed data 6 hr/day/month historic data
Costs Stated Project Cost EUR(mill) 13.00 correct
Location & Environment Sea name Baltic Sea correct
Centre latitude 56.167° correct
Centre longitude 16.021° correct
Area 0 km2 correct
Depth range (Chart Datum) 6 m - 8 m correct
Depth range stated by developer correct
Distance From Shore (reported) 2 km correct
Distance From Shore (computed from centre) 3.7 km correct
Ports Installation base Bergkvara correct
Ops and maintenance Bergkvara correct
Grid Converter platforms None correct
Offshore transformers None correct
Grid connection point correct
Cable landing point Hagbo correct
Export Cables
Please note that export cables connect the offshore transformer (substation) to either; shore or an offshore HVAC-HVDC converter station for onward transmission via HVDC cabling. Please see the converters page for planned converter stations and transmission cables.

The export cable length does not generally include the onshore component. The exception is when the onshore substation is close to shore.
Number of Export Cables 1 correct
Average length per cable 6 km correct
Transmission type (e.g. HVAC) correct
Nominal voltage 20 kV correct
Maximum voltage 24 kV correct
Power rating correct
Number of cores correct
Conductor type Al correct
Section correct
Insulation correct
Number fibre optics correct
Minimum bend radius (MBR) correct
Burial depth correct
Comments 24 kV with aluminium conductors and optical fibre. An additional 16km of the cable extends onto the land. correct
Onshore Cables (new) Number of onshore cables correct
Average length per cable 16 km correct
Comments correct
Array Cables Array cable length 2 km correct
Estimated cable length In purchased database
Transmission type (e.g. MVAC) MVAC correct
Nominal voltage 20 kV correct
Maximum voltage correct
Burial depth correct
Number of cores correct
Conductor type correct
Section correct
Insulation correct
Power rating correct
Number of fibre optics correct
Minimum bend radius (MBR) correct
Comments correct
Benefits Homes powered annually 5591 correct
CO2 reduced per year 11300 tonnes correct
SO2 reduced per year 263 tonnes correct
Expected life correct
Other Website Visit correct

Events on Yttre Stengrund
DateTypeDescriptionSourceCorrect
Subscribe
Event Type: Repowering -                                                                                                                                                                                                                                                   Repowering -
The wind farm will go through repowering with a larger capacity in the future. This depends on obtaining planning permission. Subscribe correct
May-2002
Event Type: Operation - Service and Maintenance                                                                                                                                                                                                                            Operation - Service and Maintenance
A tubine caught fire and was subsequently replaced. Other correct
Sep-2001
Event Type: Operation - Fully Commissioned                                                                                                                                                                                                                                 Operation - Fully Commissioned
Project fully commissioned Other correct
Aug-2001
Event Type: Operation - Generating Power                                                                                                                                                                                                                                   Operation - Generating Power
Started to generate power in August 2001. Visit correct
2001
Event Type: Installation - Offshore Construction Starts                                                                                                                                                                                                                    Installation - Offshore Construction Starts
Installation Year Visit correct

Please click to add windfarm events via this link, providing approximate date etc. Possible events include consent submission, approval, installation, generating power etc.
Be the first to comment on Yttre Stengrund offshore wind farm Please note, your comment will take 1 hour to appear.

Your Name * :  
Web Site (optional) : http://  
Comment * :  
* required