4C Offshore Empowering Intelligence

Hai Long 2A Offshore Wind Farm

15 Mar 2024: Update February 2024: Notice to Mariners confirms cable installation will begin from March 15 with expected completion by November 30 2024. Export cable installation and commissioning for the Hai Long 2A and 2B phases is expected at the beginning of Q2 2024 and finish in the later part of Q3 2024.
Location:
Taiwan
Status:
Pre-Construction
Capacity:
294 MW
4C Offshore | Location Map: Lat(24.002) Lon(119.869)

Subscribers can track wind farms on their dashboard.

General Information
Name
Hai Long 2A
Other Names
ZoP19; 海龍二號離岸風力發電計畫; Changhua 2-2 - Development Zone; Hailong 2A
Country
Taiwan
Development Status
Pre-Construction
Category or Round
Unlock with a freemium account
Region
Unlock with a freemium account
Comments
Unlock with a freemium account
Website
Unlock with a freemium account

Developers/Owners/Operators
Type
Organisation

Developer

Hai Long II Wind Power Co., Ltd.(海龍二號風電股份有限公司)

Hai Long II Wind Power Co., Ltd.(海龍二號風電股份有限公司)

EPC(I)-Balance of Plant

CDWE 台船環海

CDWE 台船環海

Owner

Gentari International Renewables Pte. Ltd

Gentari International Renewables Pte. Ltd

Owner

Yushan Energy Pte. Ltd.

Yushan Energy Pte. Ltd.

Owner

Northland Power, Inc.

Northland Power, Inc.

Owner

Mitsui & Co., Ltd. (三井物産株式会社)

Mitsui & Co., Ltd. (三井物産株式会社)


Offshore Construction Starts
Submitted For Consent
Consent Authorised
Financial Close
First Power
Full Commissioning
Unlock with a freemium account

Revenue Mechanism
Revenue Details
Revenue
TWD 5516/MWh (EUR 160.74/MWh)

How does the database work?

ForeSEE marine intelligence software provides you with exclusive access to a range of specialised services including the Global Offshore Wind Farm Database. ForeSEE grants you exclusive access to online and offline databases, reports, newsletters, online tools and more.

There are three levels of access: Free, Freemium and Full. Freemium allows you to personalise notifications, use the search function and access more data.

You will need Full access to use the ForeSEE interactive system, access reports, updates, news, downloads and more. To find out more about how ForeSEE software works and the benefits of Full access, enquire below.

Sign up to Freemium Enquire about ForeSEE
Power & Turbines
Windfarm Capacity
294 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
South China Sea
Latitude
24.002281°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
1
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life