Suction Bucket Monopile with Platform structure Details

Suction Bucket Monopile with Platform structure Information

General Info

Additional Specs

  • Build Year:2011

Former Meteorological Mast previously deployed at Dogger Bank offshore wind farm.
Installed Oct 2011, Decommissioned Sept 2017.

Specifications:

·        Designed for water depth         20-25 m
·        Total weight (incl. platform)        340 MT
·        Diameter of top shaft                 2.5 m
·        Diameter of bottom shaft         4.0 m
·        Bucket diameter:                 15 m
·        Bucket height                         7.5 m
·        Boat fender                         8.0 m / Pipe 2 x 0.36 m
·        Ladder                                 20.2 m / Pipe 2 x 0.22 m

Benefits:

·        NDT conducted and meets as-built specifications
·        Engineered integrity analysis confirm structure meets installation condition
·        Suction bucket pump interface intact
·        Foundation can be (re-) installed in a wide variety of conditions, incl. sand, silt, clay and layered strata
·        Installation does not require seabed preparation
·        Installation is noise free and offers no risk to marine mammals
·        Foundation can be removed by reverse installation
·        Single-lift installation
·        Bespoke lifting yoke and rigging available for installation

Please contact us for more information: +31 255 562 666 / projects@ardentglobal.com

Copyright © 4C Offshore 2019

  • ISO 14001 173953 2015 AHSO GBR UKAS 2 | 4C Offshore
  • Achilles UVDB Supply Chain Community | 4C Offshore