RoleOrganisation 
Developer
Aberdeen Offshore Wind Ltd
correct
Main Contractor-EPCI correct
Owner correct
Project Details for Aberdeen Offshore Wind Farm (EOWDC)
General Information Name Aberdeen Offshore Wind Farm (EOWDC) correct
Other names Aberdeen Bay, European Offshore Wind Deployment Centre - EOWDC correct
Country name United Kingdom correct
Region Scotland, Grampian correct
Comments MHI Vestas specially designed the V164-8.4 MW and V164-8.8 MW turbines. The turbines will be the first V164 models installed on a jacket foundation and utilising suction buckets and the 'short tower' option. The project will also be the first to validate 66kV technology. correct
Round (or category) correct
Development status Under Construction correct
Power & Turbines Project capacity 93.2 MW correct
Turbine model MHI Vestas specially designed 9 V164-8.4 MW turbines and two V164-8.8 MW turbines. correct
Turbine capacity 8.4 MW correct
Number of turbines 11 correct
Total turbine height 191 m correct
Hub height 120.00 m correct
Rotor diameter correct
Foundation Grounded: Jacket (Suction Bucket) (Three legged jacket with suction anchor foundations. Jackets (inc buckets): footprint 77x37x37m, weight 1020-1240t. Suction bucket anchors:diameter of 9.5 meters, height up to 15 meters and weight from 140 to 195 tons.) correct
Windspeed 10 year mean wind speed (2000-2009) Available online now
Costs Stated project cost GBP(mill) 335.00 correct
Location & Environment Sea name North Sea, Northern North Sea (Cromarty) correct
Centre latitude 57.226° correct
Centre longitude -1.997° correct
Area 20 km2 correct
Depth range (Chart Datum) 20 m - 30 m correct
Depth range stated by developer 19 m - 32 m correct
Distance from shore (reported) 2.4 km correct
Distance from shore (computed from centre) 2.9 km correct
Ports Installation base Pre-assembly of the turbines will take place in Esbjerg, Denmark. Jackets from Flushing (NL) correct
Ops and maintenance Aberdeen correct
Grid Converter/Collector platforms correct
Offshore transformers None correct
Grid connection point Blackdog, Aberdeenshire correct
Cable landing point Hareburn Terrace correct
Export Cables
Please note that export cables connect the offshore transformer (substation) to either; shore or an offshore HVAC-HVDC converter station for onward transmission via HVDC cabling. Please see the converters page for planned converter stations and transmission cables.

The export cable length does not generally include the onshore component. The exception is when the onshore substation is close to shore.
Number of export cables 2 correct
Average length per cable 6.5 km correct
Transmission type (e.g. HVAC) correct
Nominal voltage 66 kV correct
Maximum voltage correct
Power rating correct
Number of cores correct
Conductor type correct
Section area correct
Insulation correct
Number fibre optics correct
Export minimum bend radius (MBR) correct
Burial depth correct
Comments correct
Onshore Cables Number of onshore cables correct
Average length per cable 0.8 km correct
Comments correct
Array Cables Array cable length 13 km correct
Estimated cable length LogIn
Transmission type (e.g. MVAC) correct
Nominal voltage 66 kV correct
Maximum voltage correct
Burial depth correct
Number of cores correct
Conductor type correct
Section correct
Insulation correct
Power rating correct
Number of fibre optics correct
Minimum bend radius (MBR) correct
Comments Ten array cables will connect the turbines. correct
Benefits Homes powered annually 66009 correct
CO2 reduced per year 133405 tonnes correct
SO2 reduced per year 3102 tonnes correct
Expected life 20.0 years correct
Other Website Visit correct

Call +44 (0)1502 307 037 for more information

Keep on top of the market. Perform analysis. Make informed decisions.

CONTACT US

More information?

Receive monthly updates with our Offshore Windfarm Subscription and gain access to even more detailed information on; cabling, converters, costs, foundations, substations, turbines.

Filter :
123
StatusName
Decommissioned Beatrice Demonstration Beatrice Demonstration
Decommissioned Blyth Blyth
Fully Commissioned Barrow Barrow
Fully Commissioned Blyth Offshore Demonstrator Project - Array 2 Blyth Offshore Demonstrator Project - Array 2
Fully Commissioned Burbo Bank Burbo Bank
Fully Commissioned Burbo Bank Extension Burbo Bank Extension
Fully Commissioned Dudgeon Dudgeon
Fully Commissioned Galloper Galloper
Fully Commissioned Greater Gabbard Greater Gabbard
Fully Commissioned Gunfleet Sands Gunfleet Sands
Fully Commissioned Gunfleet Sands 3 - Demonstration Project Gunfleet Sands 3 - Demonstration Project
Fully Commissioned Gwynt y Môr Gwynt y Môr
Fully Commissioned Humber Gateway Humber Gateway
Fully Commissioned Hunterston Test Centre - Mitsubishi 7MW (onshore) Hunterston Test Centre - Mitsubishi 7MW (onshore)
Fully Commissioned Hunterston Test Centre - Siemens 6MW (onshore) Hunterston Test Centre - Siemens 6MW (onshore)
Fully Commissioned Hunterston Test Centre (onshore) Hunterston Test Centre (onshore)
Fully Commissioned Hywind Scotland Pilot Park Hywind Scotland Pilot Park
Fully Commissioned Inner Dowsing Inner Dowsing
Fully Commissioned Kentish Flats Kentish Flats
Fully Commissioned Kentish Flats Extension Kentish Flats Extension
Fully Commissioned Levenmouth demonstration turbine Levenmouth demonstration turbine
Fully Commissioned Lincs Lincs
Fully Commissioned London Array London Array
Fully Commissioned Lynn Lynn
Fully Commissioned North Hoyle North Hoyle
Fully Commissioned Ormonde Ormonde
Fully Commissioned Race Bank Race Bank
Fully Commissioned Rhyl Flats Rhyl Flats
Fully Commissioned Robin Rigg Robin Rigg
Fully Commissioned Scroby Sands Scroby Sands
Fully Commissioned Sheringham Shoal Sheringham Shoal
Fully Commissioned Teesside Teesside
Fully Commissioned Thanet Thanet
Fully Commissioned Walney Phase 1 Walney Phase 1
Fully Commissioned Walney Phase 2 Walney Phase 2
Fully Commissioned Wave Hub Wave Hub
Fully Commissioned West of Duddon Sands West of Duddon Sands
Fully Commissioned Westermost Rough Westermost Rough
Partial Generation/Under Construction Rampion Rampion
Partial Generation/Under Construction Walney Extension Walney Extension
Under Construction Aberdeen Offshore Wind Farm (EOWDC) Aberdeen Offshore Wind Farm (EOWDC)
Under Construction Beatrice Beatrice
Under Construction East Anglia ONE East Anglia ONE
Under Construction Hornsea Project One Hornsea Project One
Pre-Construction Hornsea Project Two Hornsea Project Two
Pre-Construction Kincardine Offshore Windfarm Project Kincardine Offshore Windfarm Project
Consent Authorised Blyth Offshore Demonstrator Project - Array 3A & 4 Blyth Offshore Demonstrator Project - Array 3A & 4
Consent Authorised Dogger Bank - Creyke Beck A Dogger Bank - Creyke Beck A
Consent Authorised Dogger Bank - Creyke Beck B Dogger Bank - Creyke Beck B
Consent Authorised Dogger Bank - Teesside A Dogger Bank - Teesside A
123
Please LogIn to follow projects
Find quick and easy project and company information with our online search tool

Keep on top of the market. Perform analysis. Make informed decisions.

This page is intended to be viewed online and may not be printed without a valid subscription.

Please view this page at https://www.4coffshore.com/windfarms/windfarms.aspx?windfarmID=uk47.