4C Offshore Empowering Intelligence

Apollo arrives in Ostend for Seamade work

4C Offshore | Sue Allen
By: Sue Allen 16/06/2020 4C Offshore
Jack up vessel Apollo has arrived in Ostend to mobilise for the installation of the 58 Siemens Gamesa turbines on the two Seamade projects, SeaStar and Mermaid. This will be the first time the 88m vessel has installed turbines.

It installed the foundations and pin-pile on Moray East on its last contract and will be returning to Moray to install the turbines in 2021, once the work on Seamade has concluded.
Apollo was delivered to DEME in 2018.

Premium

ForeSEE Premium, our most popular subscription, gives you full access to use the ForeSEE WebApp which includes exclusive offshore wind, transmission and vessel reports, news and downloads.

Request a 30 minute Demo

Trending News!