Developers/Owners/Operators (4)

Turbines (5)

RoleOrganisation 
Installer-Turbine correct
Main Contractor-Turbine Supply and Installation correct
Maintenance-Turbine correct
Manufacturer-Turbine
Supply 80 x SWT-3.6-120 turbines
Nominal Capacity (MW): LogIn
correct
Manufacturer-Turbine(Tower)
Welcon AS
Client: LogIn
correct

Substations (10)

RoleOrganisation 
Designer-Substation
KCI BV
Client: LogIn
correct
Designer-Substation-Topside
KCI BV
Client: LogIn
correct
Designer-Substation-Topside correct
Installer-Substation-Topside correct
Main Contractor-Substation correct
Maintenance-Substation correct
Manufacturer-Substation-Electrical correct
Manufacturer-Substation-Topside correct
Manufacturer-Substation-Transformer correct
Supplier-Crane(Substation)
Palfinger Marine- und Beteilungs-GmbH
correct

Foundations (25)

RoleOrganisation 
Contractor-Heavy Load Logistics(Foundation) correct
Designer(Detailed)-Foundation(Substation)
KCI BV
Client: LogIn
correct
Designer(Detailed)-Foundation(Turbine) correct
Designer-Foundation(substation) correct
Designer-Foundation(turbine)
Designed foundations with IMS GmbH.
correct
Designer-Foundation(turbine)
Designed foundations with COWI.
correct
Designer-Foundation(turbine) correct
Designer-Foundation(turbine) correct
Installer-Foundation(substation) correct
Installer-Foundation(turbine) correct
Main Contractor-Foundation(turbine)
Aarsleff/Bilfinger Berger JV (ABJV)
Client: LogIn
correct
Maintenance-Foundations correct
Maintenance-Foundations
Corrosion
Client: LogIn
correct
Maintenance-Foundations
C-Ventus
Client: LogIn
correct
Manufacturer-Foundation(PinPiles)
Delivery of fastening piles
Number of piles manufactured: LogIn
correct
Manufacturer-Foundation(pre-fabricated pipes) correct
Manufacturer-Foundation(pre-fabricated pipes) correct
Manufacturer-Foundation(substation) correct
Manufacturer-Foundation(turbine) correct
Manufacturer-Foundation-Primary Steel(turbine) correct
Manufacturer-Foundation-Primary Steel(turbine)
2012/2013 - Total Weight: 14500t
Monopiles -
Diameter: 5.94m
Wall Thickness: 60 - 126mm
Length: up to 61.9m

Number of foundations: LogIn
correct
Manufacturer-Transition Piece(turbine) correct
Manufacturer-Transition Piece-Primary Steel(turbine)
2012 - Fabrication of transition pieces
Number of transition pieces: LogIn
correct
Manufacturer-Transition Piece-Secondary Steel(turbine) correct
Supplier-Crane(Transition Piece)
Palfinger Marine- und Beteilungs-GmbH
correct

Array Cabling (8)

RoleOrganisation 
Installer-Array Cable(cable lay and burial)
Van Oord NV
Client: LogIn
correct
Installer-Array Cabling correct
Installer-Array Cabling
Van Oord NV
Client: LogIn
correct
Installer-Cabling(pull-in) correct
Main Contractor-Array Cabling
Van Oord NV
Client: LogIn
correct
Maintenance-Cabling correct
Manufacturer-Array Cabling correct
Supplier-Cable Protection Systems correct

Export Cabling (3)

RoleOrganisation 
Installer-Export Cabling correct
Main Contractor-Export Cabling correct
Manufacturer-Export Cabling correct

Met Masts (0)

Consultants (14)

RoleOrganisation 
Consultant-Certification correct
Consultant-EIA
correct
Consultant-EIA correct
Consultant-EIA correct
Consultant-Financial
Utiligensia Limited
Client: LogIn
correct
Consultant-Other
DHI Group
Client: LogIn
correct
Consultant-Other correct
Consultant-Other
MECAL
Client: LogIn
correct
Consultant-Other correct
Consultant-Other correct
Consultant-Other
From 2013 onward 8.2 Consulting provided/will provide: Production surveillance of all WTG nacelles, supervision of turbine commissioning, inspection after commissioning.
correct
Consultant-Other
Marine warranty survey consultant
correct
Consultant-Other
K2 Management
Client: LogIn
correct
Consultant-Weather Forecasting
StormGeo AS
Client: LogIn
Metocean forecasting and warning services.
correct

Others (13)

RoleOrganisation 
Engineer-Geotechnical correct
Installer-Other
L-3 SAM electronics
correct
Manufacturer-Other correct
Manufacturer-Other correct
Port
The Bow Terminal was used to support installation work on the site.
correct
Port correct
Port Services
Port Services for installation contractors, including agency, stevedoring, base facilities in the port of Esbjerg.
correct
Supplier-Helicopter
UNI-FLY A/S
Client: LogIn
correct
Supplier-Hydraulic Hammer
S-2000 Hydrohammer
Pile Diameter - 6.0m
Year - 2013
Turbine Monopiles

Number of piles driven in - Not number of foundations: LogIn
correct
Supplier-Navigation Aids
Sabik Offshore Ltd
Client: LogIn
correct
Supplier-Other
TP-cover ApS was awarded contract for designing and production of Transition Piece(TP) covers. The TP cover protects crew and equipment against wind, water and other natural influences.
correct
Supplier-Other
L-3 SAM electronics
correct
Supplier-Temporary Power
Scope of supply - Temporary power supply / Planning and delivery of generators (offshore) and other temporary power equipment.
correct

Call +44 (0)1502 307 037 for more information

Keep on top of the market. Perform analysis. Make informed decisions.

CONTACT US

More information?

Receive monthly updates with our Offshore Windfarm Subscription and gain access to even more detailed information on; cabling, converters, costs, foundations, substations, turbines.

Filter :
1234
StatusName
Decommissioned Hooksiel Hooksiel
Fully Commissioned Alpha Ventus Alpha Ventus
Fully Commissioned Amrumbank West Amrumbank West
Fully Commissioned BARD Offshore 1 BARD Offshore 1
Fully Commissioned Borkum Riffgrund 1 Borkum Riffgrund 1
Fully Commissioned Breitling Breitling
Fully Commissioned Butendiek Butendiek
Fully Commissioned DanTysk DanTysk
Fully Commissioned EnBW Baltic 1 EnBW Baltic 1
Fully Commissioned EnBW Baltic 2 EnBW Baltic 2
Fully Commissioned ENOVA Offshore Project Ems Emden ENOVA Offshore Project Ems Emden
Fully Commissioned Global Tech I Global Tech I
Fully Commissioned Gode Wind 1 and 2 Gode Wind 1 and 2
Fully Commissioned Meerwind Süd/Ost Meerwind Süd/Ost
Fully Commissioned Nordergründe Nordergründe
Fully Commissioned Nordsee One Nordsee One
Fully Commissioned Nordsee Ost Nordsee Ost
Fully Commissioned Riffgat Riffgat
Fully Commissioned Sandbank Sandbank
Fully Commissioned Trianel Windpark Borkum I Trianel Windpark Borkum I
Fully Commissioned Veja Mate Veja Mate
Fully Commissioned Wikinger Wikinger
Under Construction Arkona Arkona
Under Construction Borkum Riffgrund 2 Borkum Riffgrund 2
Under Construction Hohe See Hohe See
Under Construction Merkur Merkur
Under Construction OWP Albatros OWP Albatros
Pre-Construction Deutsche Bucht Deutsche Bucht
Pre-Construction GICON Schwimmendes Offshore Fundament (SOF) Pilot GICON Schwimmendes Offshore Fundament (SOF) Pilot
Pre-Construction Trianel Windpark Borkum II Trianel Windpark Borkum II
Consent Authorised Arcadis Ost 1 Arcadis Ost 1
Consent Authorised Baltic Eagle Baltic Eagle
Consent Authorised Borkum Riffgrund West 2 Borkum Riffgrund West 2
Consent Authorised Borkum Riffgrund West I Borkum Riffgrund West I
Consent Authorised Deutsche Bucht Pilot Park Deutsche Bucht Pilot Park
Consent Authorised EnBW He Dreiht EnBW He Dreiht
Consent Authorised Gode Wind 3 Gode Wind 3
Consent Authorised Gode Wind 4 Gode Wind 4
Consent Authorised Kaskasi Kaskasi
Consent Authorised OWP West OWP West
Consent Authorised Wikinger Süd Wikinger Süd
Consent Application Submitted Gennaker Gennaker
Concept/Early Planning GICON® SOF 6-8MW Test Turbine GICON® SOF 6-8MW Test Turbine
Concept/Early Planning ReaLCoE (Robust, Reliable and Large Offshore Wind Energy Converters for Clean, Low Cost and Competitive Electricity) ReaLCoE (Robust, Reliable and Large Offshore Wind Energy Converters for Clean, Low Cost and Competitive Electricity)
Development Zone Darß - priority area for wind energy Darß - priority area for wind energy
Development Zone German Central Tender 2022 (Assumed North Sea) German Central Tender 2022 (Assumed North Sea)
Development Zone German Central Tender 2023 (Assumed Baltic Sea) German Central Tender 2023 (Assumed Baltic Sea)
Development Zone German Central Tender 2024 (Assumed North Sea) German Central Tender 2024 (Assumed North Sea)
Development Zone German Central Tender 2025 (Assumed North Sea) German Central Tender 2025 (Assumed North Sea)
Development Zone German Central Tender 2026 (Assumed North Sea) German Central Tender 2026 (Assumed North Sea)
1234
Please LogIn to follow projects
Find quick and easy project and company information with our online search tool

Keep on top of the market. Perform analysis. Make informed decisions.

This page is intended to be viewed online and may not be printed without a valid subscription.

Please view this page at http://www.4coffshore.com/windfarms/organisations.aspx?windfarmID=de02.