Developers/Owners/Operators (22)

RoleOrganisation 
Developer correct
Operator
correct
Owner correct
Owner
electricity plant Mittelbaden AG & Co. KG
correct
Owner correct
Owner
Ostwürttemberg DonauRies EnBW AG
correct
Owner correct
Owner
energy and water supply Bruchsal 
correct
Owner correct
Owner correct
Owner
FairEnergie GmbH
correct
Owner
Stadtwerke Düsseldorf AG 
correct
Owner correct
Owner
Stadtwerke Ettlingen GmbH 
correct
Owner
Stadtwerke Fellbach GmbH 
correct
Owner correct
Owner
Stadtwerke Schwäbisch Gmünd GmbH 
correct
Owner
Stadtwerke Sindelfingen GmbH
correct
Owner
Stadtwerke Sinsheim supply GmbH & Co. KG 
correct
Owner correct
Owner
ZEAG Energie AG
correct
Owner
EnBW Energie Baden-Württemberg AG
correct

Turbines (4)

RoleOrganisation 
Installer(LEAD)-Turbine correct
Installer-Turbine correct
Maintenance-Turbine correct
Manufacturer-Turbine
Supply 21 x SWT-2.3-93 turbines
Nominal Capacity (MW): LogIn
correct

Substations (6)

RoleOrganisation 
Designer-Substation-Topside correct
Installer-Substation-Topside correct
Main Contractor-Substation
Managed substation build
Number of substations: LogIn
correct
Manufacturer-Substation-Electrical
ABB AS
Client: LogIn
correct
Manufacturer-Substation-Topside correct
Manufacturer-Substation-Transformer
ABB AS
Client: LogIn
correct

Foundations (24)

RoleOrganisation 
Contractor-Grouting(substation)
2010 - 4 Pin to Monopile/TP - Ducorit D4
Number of foundations grouted: LogIn
correct
Contractor-Grouting(turbines) correct
Designer(Detailed)-Foundation(Substation) correct
Designer(Detailed)-Foundation(Substation) correct
Designer(Detailed)-Foundation(Turbine) correct
Designer-Foundation(turbine) correct
Installer(LEAD)-Foundation(substation) correct
Installer(LEAD)-Transition Piece(turbine) correct
Installer-Foundation(substation) correct
Installer-Foundation(turbine) correct
Installer-Transition Piece(substation) correct
Installer-Transition Piece(turbine) correct
Main Contractor-Foundation(turbine) correct
Manufacturer-Foundation(substation) correct
Manufacturer-Foundation(turbine) correct
Manufacturer-Foundation-Primary Steel(substation) correct
Manufacturer-Foundation-Primary Steel(turbine) correct
Manufacturer-Transition Piece(substation) correct
Manufacturer-Transition Piece(turbine) correct
Manufacturer-Transition Piece-Primary Steel(substation) correct
Manufacturer-Transition Piece-Primary Steel(turbine) correct
Manufacturer-Transition Piece-Primary Steel(turbine) correct
Manufacturer-Transition Piece-Secondary Steel(substation) correct
Manufacturer-Transition Piece-Secondary Steel(turbine) correct

Array Cabling (6)

RoleOrganisation 
Installer-Array Cabling correct
Installer-Array Cabling(burial) correct
Installer-Array Cabling(cable lay) correct
Main Contractor-Array Cabling correct
Manufacturer-Array Cabling correct
Supplier-Cable Protection Systems correct

Export Cabling (5)

RoleOrganisation 
Contractor-Grid Connection correct
Installer-Export Cabling correct
Main Contractor-Export Cabling correct
Manufacturer-Export Cabling
Norddeutsche Seekabelwerke GmbH & Co. KG (General Cable Nordic AS)
Client: LogIn
correct
Manufacturer-Export Cabling correct

Met Masts (1)

RoleOrganisation 
Supplier-MetOcean Equipment
EIVA A/S
Client: LogIn
Delivered buoys for current and wave height measurement
Value: LogIn
correct

Consultants (8)

RoleOrganisation 
Consultant-EIA
correct
Consultant-Health & Safety
K2 Management
Client: LogIn
correct
Consultant-Other correct
Consultant-Other
DHI Group
Client: LogIn
correct
Consultant-Other
From 2011 onward 8.2 Consulting provided/will provide: Inspection after commissioning including boroscopy of all gearboxes, technical consultancy
correct
Consultant-Other
Provided dive support.
correct
Consultant-Project Management
Overall Project Management from tender phase, procurement, installation and commissioning on behalf and in co‐operation with the project owner EnBW
correct
Consultant-Weather Forecasting
Metocean forecasting and warning services
correct

Others (17)

RoleOrganisation 
Contractor-Other correct
Contractor-Other correct
Designer-Other correct
Designer-Other correct
Installer-Scour Protection
2010 Delivery and placement of scour protection (filter and Armour stones) for the 21 foundations
correct
Investor correct
Manufacturer-Other correct
Port
Associated Danish Ports A/S
correct
Supplier-Hydraulic Hammer correct
Supplier-Navigation Aids correct
Supplier-Navigation Aids
Sabik Offshore Ltd
Client: LogIn
correct
Supplier-Other
Supplied the protective coating for the foundation.
correct
Supplier-Other correct
Supplier-Other
Positioning hardware and software for foundation and turbine placement for A2Sea
Value: LogIn
correct
Surveyor-Geophysical
2010 Full Multi beam survey and video recording of stone works round 21 monopiles, up to 18m depth
correct
Surveyor-Geotechnical
correct
Surveyor-UXO
SeaTerra carried out a 200ha UXO survey on top of an existing cable in 2013.
correct

Call +44 (0)1502 307 037 for more information

Keep on top of the market. Perform analysis. Make informed decisions.

CONTACT US

More information?

Receive monthly updates with our Offshore Windfarm Subscription and gain access to even more detailed information on; cabling, converters, costs, foundations, substations, turbines.

Filter :
1234
StatusName
Decommissioned Hooksiel Hooksiel
Fully Commissioned Alpha Ventus Alpha Ventus
Fully Commissioned Amrumbank West Amrumbank West
Fully Commissioned BARD Offshore 1 BARD Offshore 1
Fully Commissioned Borkum Riffgrund 1 Borkum Riffgrund 1
Fully Commissioned Breitling Breitling
Fully Commissioned Butendiek Butendiek
Fully Commissioned DanTysk DanTysk
Fully Commissioned EnBW Baltic 1 EnBW Baltic 1
Fully Commissioned EnBW Baltic 2 EnBW Baltic 2
Fully Commissioned ENOVA Offshore Project Ems Emden ENOVA Offshore Project Ems Emden
Fully Commissioned Global Tech I Global Tech I
Fully Commissioned Gode Wind 1 and 2 Gode Wind 1 and 2
Fully Commissioned Meerwind Süd/Ost Meerwind Süd/Ost
Fully Commissioned Nordergründe Nordergründe
Fully Commissioned Nordsee One Nordsee One
Fully Commissioned Nordsee Ost Nordsee Ost
Fully Commissioned Riffgat Riffgat
Fully Commissioned Sandbank Sandbank
Fully Commissioned Trianel Windpark Borkum I Trianel Windpark Borkum I
Fully Commissioned Veja Mate Veja Mate
Fully Commissioned Wikinger Wikinger
Under Construction Arkona Arkona
Under Construction Borkum Riffgrund 2 Borkum Riffgrund 2
Under Construction Hohe See Hohe See
Under Construction Merkur Merkur
Under Construction OWP Albatros OWP Albatros
Pre-Construction Deutsche Bucht Deutsche Bucht
Pre-Construction GICON Schwimmendes Offshore Fundament (SOF) Pilot GICON Schwimmendes Offshore Fundament (SOF) Pilot
Pre-Construction Trianel Windpark Borkum II Trianel Windpark Borkum II
Consent Authorised Arcadis Ost 1 Arcadis Ost 1
Consent Authorised Baltic Eagle Baltic Eagle
Consent Authorised Borkum Riffgrund West 2 Borkum Riffgrund West 2
Consent Authorised Borkum Riffgrund West I Borkum Riffgrund West I
Consent Authorised Deutsche Bucht Pilot Park Deutsche Bucht Pilot Park
Consent Authorised EnBW He Dreiht EnBW He Dreiht
Consent Authorised Gode Wind 3 Gode Wind 3
Consent Authorised Gode Wind 4 Gode Wind 4
Consent Authorised Kaskasi Kaskasi
Consent Authorised OWP West OWP West
Consent Authorised Wikinger Süd Wikinger Süd
Consent Application Submitted Gennaker Gennaker
Concept/Early Planning GICON® SOF 6-8MW Test Turbine GICON® SOF 6-8MW Test Turbine
Concept/Early Planning ReaLCoE (Robust, Reliable and Large Offshore Wind Energy Converters for Clean, Low Cost and Competitive Electricity) ReaLCoE (Robust, Reliable and Large Offshore Wind Energy Converters for Clean, Low Cost and Competitive Electricity)
Development Zone Darß - priority area for wind energy Darß - priority area for wind energy
Development Zone German Central Tender 2022 (Assumed North Sea) German Central Tender 2022 (Assumed North Sea)
Development Zone German Central Tender 2023 (Assumed Baltic Sea) German Central Tender 2023 (Assumed Baltic Sea)
Development Zone German Central Tender 2024 (Assumed North Sea) German Central Tender 2024 (Assumed North Sea)
Development Zone German Central Tender 2025 (Assumed North Sea) German Central Tender 2025 (Assumed North Sea)
Development Zone German Central Tender 2026 (Assumed North Sea) German Central Tender 2026 (Assumed North Sea)
1234
Please LogIn to follow projects
Find quick and easy project and company information with our online search tool

Keep on top of the market. Perform analysis. Make informed decisions.

This page is intended to be viewed online and may not be printed without a valid subscription.

Please view this page at http://www.4coffshore.com/windfarms/organisations.aspx?windfarmID=de78.