Developers/Owners/Operators (3)

RoleOrganisation 
Developer
Essent Wind Nordsee Ost Planungsund Betriebsgesellschaft mbH (Innogy SE)
correct
Operator
Essent Wind Nordsee Ost Planungsund Betriebsgesellschaft mbH (Innogy SE)
correct
Owner correct

Turbines (6)

RoleOrganisation 
Installer(LEAD)-Turbine

Number of turbines installed: LogIn
correct
Installer-Turbine correct
Manufacturer-Turbine correct
Manufacturer-Turbine(Blades)
LM Wind Power supplied 72 blades for 24 of the Senvion 6.2M126 turbines.
correct
Manufacturer-Turbine(Tower)
Manufactured 48 turbine towers
Number of towers: LogIn
correct
Supplier-Crane(Turbine)
Palfinger Marine- und Beteilungs-GmbH
correct

Substations (9)

RoleOrganisation 
Designer-Substation-Topside
KCI BV
Client: LogIn
correct
Designer-Substation-Topside correct
Installer(LEAD)-Substation correct
Installer-Substation-Topside correct
Main Contractor-Substation correct
Maintenance-Substation correct
Manufacturer-Substation-Electrical correct
Manufacturer-Substation-Topside correct
Manufacturer-Substation-Transformer correct

Foundations (22)

RoleOrganisation 
Contractor-Grouting(turbines) correct
Designer(Detailed)-Foundation(Turbine) correct
Designer-Foundation(substation) correct
Designer-Foundation(turbine) correct
Installer-Foundation(substation) correct
Installer-Foundation(turbine) correct
Maintenance-Foundations correct
Manufacturer-Foundation(PinPiles) correct
Manufacturer-Foundation(PinPiles)
2011 - 2012 - Supply of piles - Total Weight 34600t
Piles -
Diameter: up to 2.438m
Wall Thickness: up to 65mm
Length: up to 46.06m

Number of piles manufactured: LogIn
correct
Manufacturer-Foundation(pre-fabricated pipes) correct
Manufacturer-Foundation(substation) correct
Manufacturer-Foundation(turbine) correct
Manufacturer-Foundation-Primary Steel(substation) correct
Manufacturer-Foundation-Primary Steel(turbine) correct
Manufacturer-Foundation-Secondary Steel(substation) correct
Manufacturer-Foundation-Secondary Steel(turbine) correct
Manufacturer-Secondary Steel-Boat Landing(substation) correct
Manufacturer-Secondary steel-Boat Landing(turbine) correct
Manufacturer-Transition Piece(turbine) correct
Supplier-Crane(Transition Piece)
Palfinger Marine- und Beteilungs-GmbH
correct
Supplier-Crane(Transition Piece)
Palfinger Marine- und Beteilungs-GmbH
correct
Supplier-Flanges
Supplied 60 tower flanges for the turbines (15x ø5500 mm, 15 xø5000 mm, 30 x ø5000 mm)
correct

Array Cabling (8)

RoleOrganisation 
Installer-Array Cabling correct
Installer-Array Cabling(burial) correct
Installer-Array Cabling(components) correct
Installer-Cabling(pull-in) correct
Maintenance-Cabling correct
Maintenance-Cabling
Westnetz GmbH (Innogy SE)
Client: LogIn
correct
Manufacturer-Array Cabling correct
Supplier-Cable Protection Systems correct

Export Cabling (5)

RoleOrganisation 
Installer(LEAD)-Export Cabling correct
Installer-Export Cabling correct
Main Contractor-Export Cabling correct
Main Contractor-Export Cabling correct
Manufacturer-Export Cabling correct

Met Masts (12)

RoleOrganisation 
Contractor-Grouting(metmast)
2011 - Met Mast monopile/TP - Ducorit S5
Number of foundations grouted: LogIn
correct
Designer-Foundation(metmast) correct
Designer-Met Mast correct
Installer(LEAD)-Met Mast
Van Oord NV
Client: LogIn
correct
Installer-Foundation(met mast)
Van Oord NV
Client: LogIn
correct
Installer-Tower(met mast)
Van Oord NV
Client: LogIn
correct
Installer-Transition Piece(met mast)
Van Oord NV
Client: LogIn
correct
Main Contractor-Met Mast
Van Oord NV
Client: LogIn
correct
Manufacturer-Foundation(metmast)
Ambau GmbH
Client: LogIn
Fabrication of Met Mast and Transition Piece
correct
Manufacturer-Foundation-Primary Steel(metmast)
Ambau GmbH
Client: LogIn
Fabrication of Met Mast and Transition Piece
correct
Manufacturer-Met Mast(Tower)
correct
Manufacturer-Transition Piece-Met Mast
Ambau GmbH
Client: LogIn
Fabrication of Met Mast and Transition Piece
correct

Consultants (10)

RoleOrganisation 
Consultant-Certification correct
Consultant-Health & Safety
K2 Management
Client: LogIn
correct
Consultant-Other correct
Consultant-Other
Provision of daily forecasting, vessel routing, tidal and current information.
correct
Consultant-Other
DHI Group
correct
Consultant-Other correct
Consultant-Other correct
Consultant-Other
Handling and temporary storage of foundations. Supply of logistics services for the installation vessel Victoria Mathias.
correct
Consultant-Weather Forecasting
Daily forecasts of weather and wave conditions for construction, delivered via web portal and email
correct
Contractor-Marine Coordinator correct

Others (22)

RoleOrganisation 
Contractor-Other correct
Contractor-Other
Offshore Logistic Company (RWE Innogy UK (formerly RWE npower renewables))
correct
Contractor-Other correct
Contractor-Other correct
Investor correct
Maintenance-Other correct
Manufacturer-Other
EP Tools
Client: LogIn
Power generators for TP's
correct
Port
Cuxhaven Port
The port is being used as an O&M base for the suppliers of generations EPTools.
correct
Port correct
Port correct
Project Management-Other
K2 Management
Client: LogIn
correct
Project Management-Other correct
Project Management-Other correct
Supplier-Helicopter
Awarded a contract for helicopter supply in October 2011. HTM has been supporting O&M services and the hoisting of service teams to the turbines since November 2014.
correct
Supplier-Hydraulic Hammer
S-800 Hydrohammer
Pile Diameter - 2.1m
Year - 2011
Metmast Monopile

Number of piles driven in - Not number of foundations: LogIn
correct
Supplier-Hydraulic Hammer
S-1200 Hydrohammer
Pile Diameter - 3.0m
Year - 2012
Turbine Jackets

Number of piles driven in - Not number of foundations: LogIn
correct
Supplier-Navigation Aids
Sabik Offshore Ltd
Client: LogIn
correct
Supplier-Other correct
Supplier-Other
Positioning hardware and software for foundation (jacket) and turbine placement for RWE OLC
Value: LogIn
correct
Supplier-Other
Supply of containerized emergency generating set 400kVA and two main generating sets each 1875 kVA, constructed for an inrush of 20kA. Between December 2013 - September 2014.
correct
Supplier-Other
Manufacturer of the containerized emergency generating set 400 kVA and two main generating sets with each 1875 kVA, constructed for an inrush current of 20 kA.
correct
Transport-Other
DHL transported the substation for the project.
correct

Call +44 (0)1502 307 037 for more information

Keep on top of the market. Perform analysis. Make informed decisions.

CONTACT US

More information?

Receive monthly updates with our Offshore Windfarm Subscription and gain access to even more detailed information on; cabling, converters, costs, foundations, substations, turbines.

Filter :
1234
StatusName
Decommissioned Hooksiel Hooksiel
Fully Commissioned Alpha Ventus Alpha Ventus
Fully Commissioned Amrumbank West Amrumbank West
Fully Commissioned BARD Offshore 1 BARD Offshore 1
Fully Commissioned Borkum Riffgrund 1 Borkum Riffgrund 1
Fully Commissioned Breitling Breitling
Fully Commissioned Butendiek Butendiek
Fully Commissioned DanTysk DanTysk
Fully Commissioned EnBW Baltic 1 EnBW Baltic 1
Fully Commissioned EnBW Baltic 2 EnBW Baltic 2
Fully Commissioned ENOVA Offshore Project Ems Emden ENOVA Offshore Project Ems Emden
Fully Commissioned Global Tech I Global Tech I
Fully Commissioned Gode Wind 1 and 2 Gode Wind 1 and 2
Fully Commissioned Meerwind Süd/Ost Meerwind Süd/Ost
Fully Commissioned Nordergründe Nordergründe
Fully Commissioned Nordsee One Nordsee One
Fully Commissioned Nordsee Ost Nordsee Ost
Fully Commissioned Riffgat Riffgat
Fully Commissioned Sandbank Sandbank
Fully Commissioned Trianel Windpark Borkum I Trianel Windpark Borkum I
Fully Commissioned Veja Mate Veja Mate
Fully Commissioned Wikinger Wikinger
Under Construction Arkona Arkona
Under Construction Borkum Riffgrund 2 Borkum Riffgrund 2
Under Construction Hohe See Hohe See
Under Construction Merkur Merkur
Under Construction OWP Albatros OWP Albatros
Pre-Construction Deutsche Bucht Deutsche Bucht
Pre-Construction GICON Schwimmendes Offshore Fundament (SOF) Pilot GICON Schwimmendes Offshore Fundament (SOF) Pilot
Pre-Construction Trianel Windpark Borkum II Trianel Windpark Borkum II
Consent Authorised Arcadis Ost 1 Arcadis Ost 1
Consent Authorised Baltic Eagle Baltic Eagle
Consent Authorised Borkum Riffgrund West 2 Borkum Riffgrund West 2
Consent Authorised Borkum Riffgrund West I Borkum Riffgrund West I
Consent Authorised Deutsche Bucht Pilot Park Deutsche Bucht Pilot Park
Consent Authorised EnBW He Dreiht EnBW He Dreiht
Consent Authorised Gode Wind 3 Gode Wind 3
Consent Authorised Gode Wind 4 Gode Wind 4
Consent Authorised Kaskasi Kaskasi
Consent Authorised OWP West OWP West
Consent Authorised Wikinger Süd Wikinger Süd
Consent Application Submitted Gennaker Gennaker
Concept/Early Planning GICON® SOF 6-8MW Test Turbine GICON® SOF 6-8MW Test Turbine
Concept/Early Planning ReaLCoE (Robust, Reliable and Large Offshore Wind Energy Converters for Clean, Low Cost and Competitive Electricity) ReaLCoE (Robust, Reliable and Large Offshore Wind Energy Converters for Clean, Low Cost and Competitive Electricity)
Development Zone Darß - priority area for wind energy Darß - priority area for wind energy
Development Zone German Central Tender 2022 (Assumed North Sea) German Central Tender 2022 (Assumed North Sea)
Development Zone German Central Tender 2023 (Assumed Baltic Sea) German Central Tender 2023 (Assumed Baltic Sea)
Development Zone German Central Tender 2024 (Assumed North Sea) German Central Tender 2024 (Assumed North Sea)
Development Zone German Central Tender 2025 (Assumed North Sea) German Central Tender 2025 (Assumed North Sea)
Development Zone German Central Tender 2026 (Assumed North Sea) German Central Tender 2026 (Assumed North Sea)
1234
Please LogIn to follow projects
Find quick and easy project and company information with our online search tool

Keep on top of the market. Perform analysis. Make informed decisions.

This page is intended to be viewed online and may not be printed without a valid subscription.

Please view this page at http://www.4coffshore.com/windfarms/organisations.aspx?windfarmID=de06.