Developers/Owners/Operators (4)

Turbines (4)

Substations (6)

RoleOrganisation 
Designer-Substation-Electrical
Responsible for design, procurement, installation and test of all technical systems of the transformer stations.
correct
Designer-Substation-Topside correct
Installer-Substation correct
Main Contractor-Substation
Supply of substation
Number of substations: LogIn
correct
Manufacturer-Substation-Electrical
Responsible for design, procurement, installation and test of all technical systems of the transformer stations.
correct
Manufacturer-Substation-Transformer
Responsible for design, procurement, installation and test of all technical systems of the transformer stations.
correct

Foundations (12)

RoleOrganisation 
Designer(Detailed)-Foundation(Turbine) correct
Designer-Foundation(substation) correct
Designer-Foundation(turbine) correct
Installer-Foundation(turbine) correct
Installer-Transition Piece(turbine) correct
Maintenance-Foundations correct
Manufacturer-Foundation(substation)
Supply of substation
Number of foundations: LogIn
correct
Manufacturer-Foundation(turbine) correct
Manufacturer-Foundation-Primary Steel(turbine) correct
Manufacturer-Transition Piece(turbine) correct
Manufacturer-Transition Piece-Primary Steel(turbine)
2015 - Fabrication of transition pieces
Number of transition pieces: LogIn
correct
Manufacturer-Transition Piece-Secondary Steel(turbine) correct

Array Cabling (4)

RoleOrganisation 
Installer-Array Cabling correct
Main Contractor-Array Cabling correct
Manufacturer-Array Cabling correct
Supplier-Cable Protection Systems
Supply the TekLink cable protection system (6th generation) for the cabling.
correct

Export Cabling (4)

RoleOrganisation 
Contractor-Grid Connection correct
Installer-Export Cabling
ABB A/S
Client: LogIn
correct
Main Contractor-Export Cabling correct
Manufacturer-Export Cabling
ABB A/S
Client: LogIn
correct

Met Masts (0)

Consultants (18)

RoleOrganisation 
Consultant-Certification correct
Consultant-Certification correct
Consultant-Financial correct
Consultant-Financial correct
Consultant-Legal correct
Consultant-Legal correct
Consultant-Other correct
Consultant-Other
K2 performed a substation status review.
correct
Consultant-Other
Deutsche Offshore Consult GmbH
Client: LogIn
correct
Consultant-Other correct
Consultant-Other correct
Consultant-Other
DHI Group
Client: LogIn
correct
Consultant-Other correct
Consultant-Other
K2 Management
correct
Consultant-Other
K2 Management
correct
Consultant-Other
K2 Management
Client: LogIn
correct
Consultant-Other correct
Consultant-Project Management correct

Others (13)

RoleOrganisation 
Contractor-Other
Hired by Sandbank for the Construction Supervision of Steel Works. The contract lasted between 01/12/2014 - 31/12/2015.
correct
Contractor-Other correct
Designer-Other correct
Designer-Other correct
Engineer-Geotechnical correct
Investor correct
Project Management-Other correct
Supplier-Hydraulic Hammer
Menck GmbH
Client: LogIn
correct
Supplier-Other
Doedijns Group International
Client: LogIn
correct
Supplier-Other
Planning, design, production and commissioning of a complete power quality monitoring and fiscal metering system for the OSS. The scope includes metering and communication equipment, cabinets and readout software and project management from the kick off meeting until the final commissioning offshore.
correct
Supplier-Other
Supply of containerized emergency generating set 400kVA and two main generating sets each 1875 kVA, constructed for an inrush of 20kA. Between February-July 2015.
correct
Surveyor-Geotechnical correct
Surveyor-UXO correct

Call +44 (0)1502 307 037 for more information

Keep on top of the market. Perform analysis. Make informed decisions.

CONTACT US

More information?

Receive monthly updates with our Offshore Windfarm Subscription and gain access to even more detailed information on; cabling, converters, costs, foundations, substations, turbines.

Filter :
1234
StatusName
Decommissioned Hooksiel Hooksiel
Fully Commissioned Alpha Ventus Alpha Ventus
Fully Commissioned Amrumbank West Amrumbank West
Fully Commissioned BARD Offshore 1 BARD Offshore 1
Fully Commissioned Borkum Riffgrund 1 Borkum Riffgrund 1
Fully Commissioned Breitling Breitling
Fully Commissioned Butendiek Butendiek
Fully Commissioned DanTysk DanTysk
Fully Commissioned EnBW Baltic 1 EnBW Baltic 1
Fully Commissioned EnBW Baltic 2 EnBW Baltic 2
Fully Commissioned ENOVA Offshore Project Ems Emden ENOVA Offshore Project Ems Emden
Fully Commissioned Global Tech I Global Tech I
Fully Commissioned Gode Wind 1 and 2 Gode Wind 1 and 2
Fully Commissioned Meerwind Süd/Ost Meerwind Süd/Ost
Fully Commissioned Nordergründe Nordergründe
Fully Commissioned Nordsee One Nordsee One
Fully Commissioned Nordsee Ost Nordsee Ost
Fully Commissioned Riffgat Riffgat
Fully Commissioned Sandbank Sandbank
Fully Commissioned Trianel Windpark Borkum I Trianel Windpark Borkum I
Fully Commissioned Veja Mate Veja Mate
Fully Commissioned Wikinger Wikinger
Under Construction Arkona Arkona
Under Construction Borkum Riffgrund 2 Borkum Riffgrund 2
Under Construction Hohe See Hohe See
Under Construction Merkur Merkur
Under Construction OWP Albatros OWP Albatros
Pre-Construction Deutsche Bucht Deutsche Bucht
Pre-Construction GICON Schwimmendes Offshore Fundament (SOF) Pilot GICON Schwimmendes Offshore Fundament (SOF) Pilot
Pre-Construction Trianel Windpark Borkum II Trianel Windpark Borkum II
Consent Authorised Arcadis Ost 1 Arcadis Ost 1
Consent Authorised Baltic Eagle Baltic Eagle
Consent Authorised Borkum Riffgrund West 2 Borkum Riffgrund West 2
Consent Authorised Borkum Riffgrund West I Borkum Riffgrund West I
Consent Authorised Deutsche Bucht Pilot Park Deutsche Bucht Pilot Park
Consent Authorised EnBW He Dreiht EnBW He Dreiht
Consent Authorised Gode Wind 3 Gode Wind 3
Consent Authorised Gode Wind 4 Gode Wind 4
Consent Authorised Kaskasi Kaskasi
Consent Authorised OWP West OWP West
Consent Authorised Wikinger Süd Wikinger Süd
Consent Application Submitted Gennaker Gennaker
Concept/Early Planning GICON® SOF 6-8MW Test Turbine GICON® SOF 6-8MW Test Turbine
Concept/Early Planning ReaLCoE (Robust, Reliable and Large Offshore Wind Energy Converters for Clean, Low Cost and Competitive Electricity) ReaLCoE (Robust, Reliable and Large Offshore Wind Energy Converters for Clean, Low Cost and Competitive Electricity)
Development Zone Darß - priority area for wind energy Darß - priority area for wind energy
Development Zone German Central Tender 2022 (Assumed North Sea) German Central Tender 2022 (Assumed North Sea)
Development Zone German Central Tender 2023 (Assumed Baltic Sea) German Central Tender 2023 (Assumed Baltic Sea)
Development Zone German Central Tender 2024 (Assumed North Sea) German Central Tender 2024 (Assumed North Sea)
Development Zone German Central Tender 2025 (Assumed North Sea) German Central Tender 2025 (Assumed North Sea)
Development Zone German Central Tender 2026 (Assumed North Sea) German Central Tender 2026 (Assumed North Sea)
1234
Please LogIn to follow projects
Find quick and easy project and company information with our online search tool

Keep on top of the market. Perform analysis. Make informed decisions.

This page is intended to be viewed online and may not be printed without a valid subscription.

Please view this page at http://www.4coffshore.com/windfarms/organisations.aspx?windfarmID=de12.