4C Offshore Empowering Intelligence

HelWin1 Converter

The Helwin 1 project involves a 576 MW grid link for wind projects near Helgoland. The connection meets shore at Büsum, where it continues 45 km to a new substation at Büttel. During spring and summer of 2001 horizontal channels were drilled below the North-Baltic Sea canal. At the same time, overland cable work started and cable laying work across tidal mud flats was completed. Up to 100 employees will be active on the platform for the subsequent project phase in the North Sea. An on-site jack-up platform, which is a kind of mobile logistics and accommodation platform, will be used to prepare the supplies and quarters for the crew. The team thus will save travel time of two hours each to and from the platform by helicopter, or of up to 16 hours each way by ship.
4C Offshore | HelWin1
Name
HelWin1 Converter
Status
Operational
Latitude
54.452°
Longitude
7.739°

Premium

ForeSEE Premium, our most popular subscription, gives you full access to use the ForeSEE WebApp which includes exclusive offshore wind, transmission and vessel reports, news and downloads.

Request a 30 minute Demo