TGS | Powered by 4C Offshore

4C is now TGS

We are excited to announce a significant milestone in 4C Offshore's journey. Our integration into the TGS family marks the beginning of a new era in offshore wind market intelligence.


Learn what this means for you!

IFA2 operating at full capacity

4C Offshore | Tom Russell
By: Tom Russell 22/01/2021 IFA2
Interconnexion France-Angleterre 2 (IFA2), National Grid’s second electricity interconnector linking the UK and France, is now able to flow low carbon electricity between the two countries at full capacity.

Wholesale power traders started buying capacity to transport power across the 149-mile subsea power cable, which stretches along the sea floor between Fareham, Hampshire in the UK and near Caen, Normandy in France, yesterday.
A joint venture with French Transmission System Operator RTE, IFA2 increases the amount of clean energy that can be shared between the two countries.


With a capacity of 1000 MW, the high voltage direct current (HVDC) power cable can provide enough energy to power 1 million British homes and is expected to meet 1.2% of Britain’s electricity demand.

Since construction began in 2018, IFA2 has seen more than 1,000 engineers and specialists work a total of around 3.2 million working hours to date.


Jon Butterworth, Managing Director of National Grid Ventures, said: “IFA2 is the latest feat of world-class engineering helping to transform and decarbonise the electricity systems of Britain and its European neighbours. We’re delighted to have been able to again work with our partners RTE to strengthen the connection between the French and British power grids. Together we are now able to help deliver cleaner, more secure, and more affordable energy to consumers at both ends of the cable. Our first interconnector together, IFA, has been successfully operating for more than 30 years. We look forward to working together with RTE over the next 30 years, to support the delivery of net zero targets to fight climate change across the UK and Europe.”


National Grid’s portfolio now includes four operational interconnectors: two to France (
IFA and IFA2), one to the Netherlands (BritNed) and one to Belgium (Nemo Link). Two further projects are under construction - Norway (North Sea Link, operational 2021) and Denmark (Viking Link, operational 2023).


For more information on interconnector projects worldwide, click here.    Alternatively, you can view projects across the globe using 4C Offshore's Interactive Map.

Premium

4C Offshore Premium, our most popular subscription, gives you full access to use the 4C Offshore WebApp which includes exclusive offshore wind, transmission and vessel reports, news and downloads.

Request a 30 minute Demo

Trending News!