TGS | Powered by 4C Offshore

4C is now TGS

We are excited to announce a significant milestone in 4C Offshore's journey. Our integration into the TGS family marks the beginning of a new era in offshore wind market intelligence.


Learn what this means for you!

Jan De Nul loads first jackets for Taipower

4C Offshore | Tom Russell
By: Tom Russell 21/05/2020 Jan De Nul Group
Shortly after the first pin piles were transported to Taiwan, Jan De Nul Group has announced that the first jacket foundations for the Taiwan Power Company Offshore Windfarm Phase 1 Project – Demonstration are ready to leave the South Korean fabrication yard of Samkang.

Jan De Nul Group will transport 21 four-legged jackets from South Korea to the Taiwan offshore site in the coming weeks. The jackets will be shipped in five batches of three to five units on a self-propelled semi-submersible transport vessel. For this overseas transport, Jan De Nul Group has signed a contract with Taiwan based Hung Hua Construction Co., Ltd.

During the load-out operations at the yard of Samkang, the crew on board of the transport vessel remains isolated from all activities near and on shore in order to avoid all risk of contamination with COVID-19.
 
The 21 jackets for the wind farm measure between 55 m and 62 m in overall length. The heaviest unit weighs approximately 1,100 tonnes, and the combined total weight is approximately 22,000 tonnes.

The jackets include a 7.2 m high Transition Piece (TP) with a diameter of 5.4 m to support towers carrying the 5.2 MW turbines. Each jacket also has two davit cranes for cargo hoisting and two boat landings to enable personnel access. The jackets are equipped with specialised offshore accessories such as navigation lights, foghorns, and cameras.

Jan De Nul Group initiated the fabrication process in the summer of 2019. The first jacket was completed by the second half of April 2020, well in time to allow a timely installation.

Upon arrival in Taiwan, the 21 jackets will be custom cleared before travelling to their final destination approximately 8 km off the coast of Fangyuan in Central Western Taiwan, where Jan De Nul Group is responsible for their installation. Each jacket will be anchored to the seabed by four pin piles of 3.1 m diameter each.
 

For more information on offshore wind farms worldwide, click here.

Premium

4C Offshore Premium, our most popular subscription, gives you full access to use the 4C Offshore WebApp which includes exclusive offshore wind, transmission and vessel reports, news and downloads.

Request a 30 minute Demo

Trending News!