TGS | Powered by 4C Offshore

4C is now TGS

We are excited to announce a significant milestone in 4C Offshore's journey. Our integration into the TGS family marks the beginning of a new era in offshore wind market intelligence.


Learn what this means for you!

Jan De Nul vessel depart Coastal Virginia Offshore Wind

4C Offshore | Tom Russell
By: Tom Russell 01/07/2020 Jan De Nul Group
Jan De Nul Group’s offshore installation vessels Vole au vent and Adhémar de Saint-Venant have left the United States after having completed the installation of the Coastal Virginia Offshore Wind project.
 
Ørsted Wind Power North America LLC selected Jan De Nul Group to install a 12MW demonstrator Offshore Wind Farm, 27 miles off the coast of Virginia. The project, owned by Dominion Energy, is based on an Ørsted design and is only the second offshore wind farm in U.S. waters, after the 30MW Block Island Wind Farm, commissioned in 2016 at 3 kilometres off the coast of Rhode Island. Moreover, the Coastal Virginia wind farm features the very first offshore wind turbines in U.S. Federal Waters.
 
“This contract is another important milestone for Jan De Nul’s international expansion in offshore wind farm construction”, says Philippe Hutse, Offshore Director of Jan De Nul Group. “After having expanded into Asia with the completion of the Formosa 1 Phase 2 project and with two further offshore wind projects under construction in Taiwan, Changhua OWF and Formosa 2 OWF, we are proud to have been able to support Dominion Energy and Ørsted in the U.S.”
  
The scope for Jan De Nul Group included the transport and installation of both offshore foundations and wind turbines, as well as the procurement and installation of the scour protection. Each foundation is composed of a monopile and transition piece.
 
Peter De Pooter, Manager Offshore Renewables at Jan De Nul Group, concludes: “This project is of great importance for Jan De Nul Group as it has given us the opportunity to work with local, state and federal government agencies in the U.S. and allowed us to familiarize ourselves with the construction of U.S. offshore wind farms.”
 
Jan De Nul’s offshore jack-up installation vessel
Vole au vent delivered the installation works and was assisted by the multipurpose vessel Adhémar de Saint-Venant to perform the scour protection works.
 


For more information on offshore wind farms worldwide, click here.

Premium

4C Offshore Premium, our most popular subscription, gives you full access to use the 4C Offshore WebApp which includes exclusive offshore wind, transmission and vessel reports, news and downloads.

Request a 30 minute Demo

Trending News!