4C Offshore Empowering Intelligence

M.C. Construction finish blade rack grillages

4C Offshore | Matthew White
By: Matthew White 08/05/2018 M.C. Construction Limited
M.C. Construction LimitedM.C. Construction (Cleveland) Limited (MCC), announced its completion of the fabrication and coating of its two blade rack grillages for the company's upcoming blade upgrade campaign at an undisclosed offshore wind farm.

The blade rack grillages aim to be loaded onto the MPI Adventure next week. While this is occurring works will continue on the mezzanine deck structures which are scheduled to load out later this month.

Premium

ForeSEE Premium, our most popular subscription, gives you full access to use the ForeSEE WebApp which includes exclusive offshore wind, transmission and vessel reports, news and downloads.

Request a 30 minute Demo

Trending News!