TGS | Powered by 4C Offshore

4C is now TGS

We are excited to announce a significant milestone in 4C Offshore's journey. Our integration into the TGS family marks the beginning of a new era in offshore wind market intelligence.


Learn what this means for you!

Orion heads to Europe

4C Offshore | Tom Russell
By: Tom Russell 15/10/2019 4C Offshore
DEME Group's latest offshore installation vessel Orion is on the way to Europe for the final construction phase before it heads to the first offshore wind project. In a few weeks the vessel will arrive in Rostock, Germany where it will be equipped with a Liebherr crane with a lifting capacity of 5,000 tonnes.

The vessel was constructed at COSCO Qidong shipyard in China. At 216.5m long, it is equipped with DP3 (Dynamic Positioning) capability and can accommodate a total of 131 people. The vessel is also to be outfitted with a Walk-to-Work gangway for personnel transfers.

DEME Group subsidiary GeoSea will deploy the vessel for the construction of large offshore wind turbines.
Orion will be suitable to transport the monopiles, jackets, wind turbine components and other structures associated with the construction of giant multi-megawatt wind turbines.

For more information about offshore wind farm construction vessels across the globe,
click here.

Premium

4C Offshore Premium, our most popular subscription, gives you full access to use the 4C Offshore WebApp which includes exclusive offshore wind, transmission and vessel reports, news and downloads.

Request a 30 minute Demo

Trending News!