Primo Marine nets further NeuConnect work

In: Interconnectors
06/05/2020
Primo Marine has secured a contract to assist with the offshore permit application for the NeuConnect interconnector between Germany and the United Kingdom.

The scope entails work like assistance to the marine permit application, route engineering, burial assessment, seabed mobility studies and management & maintenance of the georeferenced route database. It follows work which started in 2018 with the crossing agreement management, landfall feasibility studies, survey management and the metocean package.


NeuConnect is a proposed high voltage direct current subsea electricity interconnector between the UK and Germany. With an anticipated capacity of 1.4GW, the link will have a total cable length of 720 km. The project will see the first connection between the UK and Germany, linking Greystones in the UK and Conneforde in Germany. The cable route passes through UK, Netherlands and German territorial waters before making landfall at either end.

For more information on interconnector projects worldwide, click here. You can view cable routes for interconnectors and wind farms using 4C Offshore's Interactive Map.

Copyright © 4C Offshore 2019

  • ISO 14001 173953 2015 AHSO GBR UKAS 2 | 4C Offshore
  • Achilles UVDB Supply Chain Community | 4C Offshore