Turbine Installation Vessels (8)

VesselRoleOrganisation 
LogIn Vessel-Foundation Installation(turbine)
MPI Offshore Ltd (Vroon Group BV)
Client: LogIn
Period: 04-Jan-2014 to 24-May-2014
correct
LogIn Vessel-Foundation Installation(turbine)
Ballast Nedam Offshore (Ballast Nedam NV)
Client: LogIn
Period: 26-Aug-2014 to 20-Sep-2014
correct
LogIn Vessel-Foundation Installation(turbine)
MPI Offshore Ltd (Vroon Group BV)
Client: LogIn
Period: 06-Sep-2014 to 22-Mar-2015
correct
LogIn Vessel-Scour Protection Installation
Peter Madsen Rederi A/S and Svensk Sjöentreprenad AB
Client: LogIn
Period: Mar-2013 to 21-Sep-2013
correct
LogIn Vessel-Scour Protection Installation
Peter Madsen Rederi A/S and Svensk Sjöentreprenad AB
Client: LogIn
Period: 20-Mar-2013 to 20-Jun-2013
correct
LogIn Vessel-Transition Piece Installation(turbine)
MPI Offshore Ltd (Vroon Group BV)
Client: LogIn
Period: 04-Jan-2014 to 24-May-2014
correct
LogIn Vessel-Transition Piece Installation(turbine)
MPI Offshore Ltd (Vroon Group BV)
Client: LogIn
Period: 06-Sep-2014 to 22-Mar-2015
correct
LogIn Vessel-Turbine Installation
MPI Offshore Ltd (Vroon Group BV)
Client: LogIn
Period: 05-Feb-2015 to 09-Sep-2015
correct

Substation Installation Vessels (2)

Cable Installation Vessels (4)

VesselRoleOrganisation 
LogIn Vessel-Array Cable Installation(cable lay and burial)
Siem Offshore AS
Client: LogIn
Period: 09-May-2014 to 24-Jul-2014
Siddis Mariner installed the array cables, supported by Siem Moxie. The ROVJET 810 was utilised aboard the vessel to carry out burial.
Cable length km: LogIn
correct
LogIn Vessel-Array Cable Maintenance correct
LogIn Vessel-Export Cable Installation(cable lay and burial)
Prysmian Powerlink Srl (Prysmian Group S.p.A.)
Client: LogIn
Period: 19-Jul-2014 to 29-Jul-2014
correct
LogIn Vessel-Route Clearance(PLGR)
Peter Madsen Rederi A/S and Svensk Sjöentreprenad AB
Client: LogIn
Period: 12-Apr-2012 to 21-Sep-2013
The vessel was clearing boulders on site.
correct

Met Mast Installation Vessels (3)

VesselRoleOrganisation 
LogIn Vessel-Foundation Installation(met mast)
Muhibbah Marine Engineering (Deutschland) GmbH
Client: LogIn
Period: 05-Apr-2005 to 10-Apr-2005
correct
LogIn Vessel-Met Mast Installation
Muhibbah Marine Engineering (Deutschland) GmbH
Client: LogIn
Period: 05-Apr-2005 to 10-Apr-2005
correct
LogIn Vessel-Transition Piece Installation(met mast)
Muhibbah Marine Engineering (Deutschland) GmbH
Client: LogIn
Period: 05-Apr-2005 to 10-Apr-2005
correct

Survey Vessels (2)

VesselRoleOrganisation 
LogIn Vessel-Survey(Geophysical)
MMT AB
Client: LogIn
Period: 24-Aug-2012 to 10-Sep-2012
correct
LogIn Vessel-Survey(Geotechnical)
Vroon Group BV
Client: LogIn
Period: 10-Apr-2013 to 30-Apr-2013
MS Satisfaction was used for collecting soil samples.
correct

Operations and Maintenance Vessels (including Crew Transfer) (48)

VesselRoleOrganisation 
LogIn Vessel-Crew Transfer
Carlin Boat Charters Ltd
Client: LogIn
Period: 11-Sep-2014 to 31-Oct-2014
correct
LogIn Vessel-Crew Transfer
Fred. Olsen Windcarrier AS
Client: LogIn
Period: 29-Apr-2014 to 04-Jul-2014
correct
LogIn Vessel-Crew Transfer
Northern Offshore Services AB
Client: LogIn
Period: Jul-2014 to 11-Mar-2017
correct
LogIn Vessel-Crew Transfer
EMS Maritime Offshore GmbH
Client: LogIn
Period: Jul-2014 to 06-Jan-2015
correct
LogIn Vessel-Crew Transfer
Odfjell Wind AS
Client: LogIn
Period: 07-Jul-2014 to 11-Jul-2014
correct
LogIn Vessel-Crew Transfer
Wind Farm Base
Client: LogIn
Period: 26-Aug-2014 to 05-Sep-2014
correct
LogIn Vessel-Crew Transfer
ASP Workboats Ltd
Client: LogIn
Period: 12-Sep-2014 to 14-Sep-2014
correct
LogIn Vessel-Crew Transfer
Northern Offshore Services AB
Client: LogIn
Period: 13-Oct-2014 to 25-Nov-2014
correct
LogIn Vessel-Crew Transfer
Northern Offshore Services AB
Client: LogIn
Period: 26-Nov-2014 to 19-Jan-2016
correct
LogIn Vessel-Crew Transfer
Maritime Craft Services (Clyde) Ltd
Client: LogIn
Period: 15-Feb-2015 to 26-Mar-2015
correct
LogIn Vessel-Crew Transfer
Maritime Craft Services (Clyde) Ltd
Client: LogIn
Period: 12-Mar-2015 to 06-Nov-2015
correct
LogIn Vessel-Crew Transfer
Odfjell Wind AS
Client: LogIn
Period: LogIn
correct
LogIn Vessel-Crew Transfer
Maritime Craft Services (Clyde) Ltd
Client: LogIn
Period: 06-Feb-2015 to May-2015
correct
LogIn Vessel-Crew Transfer
KEM Offshore
Client: LogIn
Period: 27-Feb-2015 to 29-Sep-2015
correct
LogIn Vessel-Crew Transfer
EMS Maritime Offshore GmbH
Client: LogIn
Period: 19-Apr-2015 to 07-Nov-2015
correct
LogIn Vessel-Crew Transfer
Maritime Craft Services (Clyde) Ltd
Client: LogIn
Period: 09-Apr-2015 to 21-Oct-2015
correct
LogIn Vessel-Crew Transfer
Sure Wind Marine
Client: LogIn
Period: 26-Apr-2015 to 24-Jul-2015
correct
LogIn Vessel-Crew Transfer
KEM Offshore
Client: LogIn
Period: 20-May-2015 to 21-Oct-2015
correct
LogIn Vessel-Crew Transfer
Sure Wind Marine
Client: LogIn
Period: 08-May-2015 to 12-May-2015
correct
LogIn Vessel-Crew Transfer
RIX Sea Shuttle
Client: LogIn
Period: 11-May-2015 to 31-Aug-2015
correct
LogIn Vessel-Crew Transfer
Maritime Craft Services (Clyde) Ltd
Client: LogIn
Period: 15-Jul-2015 to 07-Nov-2015
MCS Taku CPP was working on site providing crew transfer services.
correct
LogIn Vessel-Crew Transfer
Braveheart Marine BV
Client: LogIn
Period: 27-Aug-2015 to 26-Oct-2015
correct
LogIn Vessel-Crew Transfer
Odfjell Wind AS
Client: LogIn
Period: 08-Sep-2015 to 15-Dec-2015
correct
LogIn Vessel-Crew Transfer
Odfjell Wind AS
Client: LogIn
Period: 05-Mar-2016 to 26-Mar-2016
correct
LogIn Vessel-Crew Transfer
Braveheart Marine BV
Client: LogIn
Period: 20-Feb-2016 to 03-Mar-2016
correct
LogIn Vessel-Crew Transfer
SeaZip Offshore Service
Client: LogIn
Period: 21-Apr-2016 to 14-Jun-2016
correct
LogIn Vessel-Crew Transfer
Northern Offshore Services AB
Client: LogIn
Period: 25-Mar-2016 to 21-Apr-2016
correct
LogIn Vessel-Crew Transfer
Njord Offshore
Client: LogIn
Period: May-2016 to 27-Sep-2016
correct
LogIn Vessel-Crew Transfer
OPUS Marine GmbH
Client: LogIn
Period: 22-Apr-2016 to 10-Oct-2016
correct
LogIn Vessel-Crew Transfer
KEM Offshore
Client: LogIn
Period: 31-Jul-2016 to 06-Aug-2016
correct
LogIn Vessel-Crew Transfer
SeaZip Offshore Service
Client: LogIn
Period: 19-Jul-2016 to 23-Jul-2016
correct
LogIn Vessel-Crew Transfer
SeaZip Offshore Service
Client: LogIn
Period: 15-Aug-2016 to Sep-2016
correct
LogIn Vessel-Crew Transfer
CWind Limited (Global Marine Systems Ltd)
Client: LogIn
Period: 19-Sep-2016 to 26-Sep-2016
correct
LogIn Vessel-Crew Transfer
Maritime Craft Services (Clyde) Ltd
Client: LogIn
Period: 11-Mar-2017 to 28-Sep-2017
correct
LogIn Vessel-Crew Transfer
Njord Offshore
Client: LogIn
Period: 06-May-2017 to 05-Sep-2017
correct
LogIn Vessel-Crew Transfer
OPUS Marine GmbH
Client: LogIn
Period: 30-Apr-2017 to 30-Sep-2017
correct
LogIn Vessel-Crew Transfer
Odfjell Wind AS
Client: LogIn
Period: 27-Jul-2017 to 02-Aug-2017
correct
LogIn Vessel-Crew Transfer
Braveheart Marine BV
Client: LogIn
Period: 16-Jan-2016 to 26-Jan-2016
Channel Chieftain VI provided crew transfers on the site during this period.
correct
LogIn Vessel-Crew Transfer
Braveheart Marine BV
Client: LogIn
Period: 15-Jun-2016 to 15-Jun-2016
Channel Chieftain VI worked on the site providing crew transfer services on site.
correct
LogIn Vessel-Crew Transfer
Seacat Services Ltd
Client: LogIn
Period: 12-Sep-2013 to 27-Sep-2013
correct
LogIn Vessel-Crew Transfer
Odfjell Wind AS
Client: LogIn
Period: 23-Mar-2018 to 15-May-2018
correct
LogIn Vessel-Crew Transfer
Maritime Craft Services (Clyde) Ltd
Client: LogIn
Period: 07-Mar-2018 to 15-May-2018
correct
LogIn Vessel-Crew Transfer
Sure Wind Marine
Client: LogIn
Period: 25-Apr-2018 to 15-May-2018
correct
LogIn Vessel-Heavy Maintenance
MPI Offshore Ltd (Vroon Group BV)
Client: LogIn
Period: 11-Jan-2018 to 13-Jan-2018
correct
LogIn Vessel-Heavy Maintenance
MPI Offshore Ltd (Vroon Group BV)
Client: LogIn
Period: 23-Nov-2016 to 25-Nov-2016
correct
LogIn Vessel-Heavy Maintenance
MPI Offshore Ltd (Vroon Group BV)
Client: LogIn
Period: 12-Jan-2016 to 25-Jan-2016
correct
LogIn Vessel-Heavy Maintenance
MPI Offshore Ltd (Vroon Group BV)
Client: LogIn
Period: 02-May-2015 to 10-Aug-2015
correct
LogIn Vessel-Operations and Maintenance
Fred. Olsen Windcarrier AS
Client: LogIn
Period: 21-Nov-2013 to 22-Nov-2013
correct

Other Vessels (10)

VesselRoleOrganisation 
LogIn Vessel-Accommodation
C-Bed Floating Hotels
Client: LogIn
Period: 11-Feb-2015 to 05-May-2015
correct
LogIn Vessel-Accommodation
GeoSea NV (DEME NV)
Client: LogIn
Period: Jul-2014 to 30-Aug-2014
correct
LogIn Vessel-Accommodation
C-Bed Floating Hotels
Client: LogIn
Period: 30-Apr-2015 to 06-Nov-2015
correct
LogIn Vessel-Construction Support (W2W)
Siem Offshore AS
Client: LogIn
Period: 06-May-2014 to 20-Apr-2015
Siem Moxie worked in conjunction with the Siddis Mariner, supporting the array cable installation with W2W access.
correct
LogIn Vessel-Support
Blue Star Line A/S
Client: LogIn
Period: 11-Dec-2013 to 27-May-2014
correct
LogIn Vessel-Support
Jasmund Shipping GmbH
Client: LogIn
Period: 05-Apr-2005 to 10-Apr-2005
correct
LogIn Vessel-Support
Frisia-Offshore
Client: LogIn
Period: 16-May-2013 to 31-Aug-2013
correct
LogIn Vessel-Support
Rohden Ship Management GmbH
Client: LogIn
Period: 15-May-2015 to 22-May-2015
correct
LogIn Vessel-Unknown
Olympic Shipping AS
Client: LogIn
Period: 04-Sep-2015 to 21-Oct-2015
correct
LogIn Vessel-Unknown
Solstad Offshore AS
Client: LogIn
Period: 17-Mar-2015 to 18-Mar-2015
correct

Call +44 (0)1502 307 037 for more information

Keep on top of the market. Perform analysis. Make informed decisions.

CONTACT US

More information?

Receive monthly updates with our Offshore Windfarm Subscription and gain access to even more detailed information on; cabling, converters, costs, foundations, substations, turbines.

Filter :
1234
StatusName
Decommissioned Hooksiel Hooksiel
Fully Commissioned Alpha Ventus Alpha Ventus
Fully Commissioned Amrumbank West Amrumbank West
Fully Commissioned BARD Offshore 1 BARD Offshore 1
Fully Commissioned Borkum Riffgrund 1 Borkum Riffgrund 1
Fully Commissioned Breitling Breitling
Fully Commissioned Butendiek Butendiek
Fully Commissioned DanTysk DanTysk
Fully Commissioned EnBW Baltic 1 EnBW Baltic 1
Fully Commissioned EnBW Baltic 2 EnBW Baltic 2
Fully Commissioned ENOVA Offshore Project Ems Emden ENOVA Offshore Project Ems Emden
Fully Commissioned Global Tech I Global Tech I
Fully Commissioned Gode Wind 1 and 2 Gode Wind 1 and 2
Fully Commissioned Meerwind Süd/Ost Meerwind Süd/Ost
Fully Commissioned Nordergründe Nordergründe
Fully Commissioned Nordsee One Nordsee One
Fully Commissioned Nordsee Ost Nordsee Ost
Fully Commissioned Riffgat Riffgat
Fully Commissioned Sandbank Sandbank
Fully Commissioned Trianel Windpark Borkum I Trianel Windpark Borkum I
Fully Commissioned Veja Mate Veja Mate
Fully Commissioned Wikinger Wikinger
Under Construction Arkona Arkona
Under Construction Borkum Riffgrund 2 Borkum Riffgrund 2
Under Construction Hohe See Hohe See
Under Construction Merkur Merkur
Under Construction OWP Albatros OWP Albatros
Pre-Construction Deutsche Bucht Deutsche Bucht
Pre-Construction GICON Schwimmendes Offshore Fundament (SOF) Pilot GICON Schwimmendes Offshore Fundament (SOF) Pilot
Pre-Construction Trianel Windpark Borkum II Trianel Windpark Borkum II
Consent Authorised Arcadis Ost 1 Arcadis Ost 1
Consent Authorised Baltic Eagle Baltic Eagle
Consent Authorised Borkum Riffgrund West 2 Borkum Riffgrund West 2
Consent Authorised Borkum Riffgrund West I Borkum Riffgrund West I
Consent Authorised Deutsche Bucht Pilot Park Deutsche Bucht Pilot Park
Consent Authorised EnBW He Dreiht EnBW He Dreiht
Consent Authorised Gode Wind 3 Gode Wind 3
Consent Authorised Gode Wind 4 Gode Wind 4
Consent Authorised Kaskasi Kaskasi
Consent Authorised OWP West OWP West
Consent Authorised Wikinger Süd Wikinger Süd
Consent Application Submitted Gennaker Gennaker
Concept/Early Planning GICON® SOF 6-8MW Test Turbine GICON® SOF 6-8MW Test Turbine
Concept/Early Planning ReaLCoE (Robust, Reliable and Large Offshore Wind Energy Converters for Clean, Low Cost and Competitive Electricity) ReaLCoE (Robust, Reliable and Large Offshore Wind Energy Converters for Clean, Low Cost and Competitive Electricity)
Development Zone Darß - priority area for wind energy Darß - priority area for wind energy
Development Zone German Central Tender 2022 (Assumed North Sea) German Central Tender 2022 (Assumed North Sea)
Development Zone German Central Tender 2023 (Assumed Baltic Sea) German Central Tender 2023 (Assumed Baltic Sea)
Development Zone German Central Tender 2024 (Assumed North Sea) German Central Tender 2024 (Assumed North Sea)
Development Zone German Central Tender 2025 (Assumed North Sea) German Central Tender 2025 (Assumed North Sea)
Development Zone German Central Tender 2026 (Assumed North Sea) German Central Tender 2026 (Assumed North Sea)
1234
Please LogIn to follow projects
Find quick and easy project and company information with our online search tool

Keep on top of the market. Perform analysis. Make informed decisions.

This page is intended to be viewed online and may not be printed without a valid subscription.

Please view this page at http://www.4coffshore.com/windfarms/vesselspread.aspx?windfarmID=de05.