BorWin4 Converter

BorWin4 has a total route length of around 280 kilometers, around 125 kilometers of which at sea. The onshore grid connection point is Hanekenfähr. Hanekenfähr is particularly suitable since the Emsland nuclear power plant will be taken offline in 2022 freeing up capacity. Windfarms N-6.6 and N-6.7 will connect via 66 kV direct connection concept. https://offshore.amprion.net/Projekte/
4C Offshore | Image Not Available
Name
BorWin4 Converter
Status
Planned
Latitude
54.298°
Longitude
6.025°

Premium

4C Offshore Premium, our most popular subscription, gives you full access to use the 4C Offshore WebApp which includes exclusive offshore wind, transmission and vessel reports, news and downloads.

Request a 30 minute Demo
Transmission Cable
Name
Number of Cables
Minimum Cable Length
Nominal Voltage
Comments