Jeju Island 2 Converter

Part of the Jind-Jeju HVDC interconnection/conversion system. Three HVDC cables and one MVDC cable. Upgraded from 250 kV in 2020.
Converter
Name
Jeju Island 2 Converter
Status
Operational
Latitude
Longitude

login to improve information access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads. Sign up now!

Copyright © 4C Offshore 2021

  • ISO 14001 173953 2015 AHSO GBR UKAS 2 | 4C Offshore
  • Achilles UVDB Supply Chain Community | 4C Offshore