NOR-12-1 Converter

NOR-12-1 will connect wind farms N-12.1 (2 GW) to Unterweser, via 525 kV HVDC cable and border corridor N-III, by Q4 2030. Distance esitmated.
4C Offshore | Image Not Available
Name
NOR-12-1 Converter
Status
Planned
Latitude
54.781°
Longitude
6.177°

Login to Improve Information Access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!