LanWin5 Converter

According to the draft Area Development Plan (June 2020). Areas N-13.2 and N-13.3 will be tendered after 2025 and built after 2030 and contribute to longer term targets of 40 GW by 2040. Connection via NOR-13-1.
Converter
Name
LanWin5 Converter
Status
Planned
Latitude
55.020°
Longitude
6.333°