Modular Offshore Grid II (MOG II) Platform B Converter

MOG II is a planned offshore transmission system for post 2020 offshore wind farms in Belgium. The MOG II will consist of up to three 700MW HV platforms (most likely) or two 1GW platforms. Platforms will convert from 66kV AC to 220kV AC and export to shore via up to six 220kV cables of 50km each and 350MW minimum. The scope also includes up to two interconnection cables of 10-15km each.