TGS | Powered by 4C Offshore

4C is now TGS

We are excited to announce a significant milestone in 4C Offshore's journey. Our integration into the TGS family marks the beginning of a new era in offshore wind market intelligence.


Learn what this means for you!

LanWin5 (NOR-13-1) Converter

TenneT will connect windfarms N-12.3 amd N-13.2 via Lanwin5(NOR-13-1) via the border corridor N-III through the territorial sea via the island of Baltrum to the search area Rastede. Wind farms will connect via 66 kV. Transmission is 525 kV and rated at 2 GW. Commissioning envisaged for 2031-32.
4C Offshore | Image Not Available
Name
LanWin5 (NOR-13-1) Converter
Status
Planned
Latitude
55.089°
Longitude
6.260°

Premium

4C Offshore Premium, our most popular subscription, gives you full access to use the 4C Offshore WebApp which includes exclusive offshore wind, transmission and vessel reports, news and downloads.

Request a 30 minute Demo
Transmission Cable
Name
Number of Cables
Minimum Cable Length
Nominal Voltage
Comments