LanWin5 Converter

According to the draft Area Development Plan (June 2020). Areas N-13.2 and N-13.3 will be tendered after 2025 and built after 2030 and contribute to longer term targets of 40 GW by 2040. Connection via NOR-13-1.
4C Offshore | Image Not Available
Name
LanWin5 Converter
Status
Planned
Latitude
55.020°
Longitude
6.333°

Login to Improve Information Access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!