Balearic Islands: ROMULO 2 Interconnector

Santa Ponsa
Balearic Islands: ROMULO 2
(200.000 MW)
Torrent
Spain
Spain

login to improve information access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads. Sign up now!

Country & Landfall 1

Country
Spain
Landfall
Bay of Santa Ponsa (Mallorca)
Cable Type Landfall To Substation
Underground
Substation
Santa Ponsa
Grid Connection Point
Santa Ponsa

Subsea Cabling

Cable Name Balearic Islands: ROMULO 2
Cable Type Interconnector
Cable Current HVAC
Status Fully Commissioned
Status Comments
Capacity MW 200.000 MW
Cable Tech HVAC
Total Length of Cable 126.00 km
Length Submarine 118.00 km
Length Land 8.00 km
DC Voltage
AC Voltage 132 kV
Configuration
Project Cost Mill 225.00 Mill
Project Cost Currency EUR
Website Visit
Project Comments The cabling connects the islands of Majorca/Mallorca and Ibiza. This project is included in Electrica de Espana's Planning Network Electricity Transmission 2015-2020 (Planificación de la red de transporte de electricidad 2015-2020). This is included in the Planned Actions 2015-2020 (Actuaciones planificadas 2015-2020).

Country & Landfall 2

Country
Spain
Landfall
Sa Punta, Bay of Talamamca (Ibiza)
Cable Type Landfall To Substation
Underground
Substation
Torrent
Grid Connection Point
Torrent
EPC(I)-Cabling
Stakeholder
Description
Stakeholder
Description
Installer-Cabling
Stakeholder
Description
Stakeholder
Description
Installer-Export Cabling
Stakeholder
Description
Installer-Export Cabling(burial)
Stakeholder
Description
Installer-Onshore Cabling
Stakeholder
Description
Stakeholder
Description
Stakeholder
Description
Manufacturer-Cabling
Stakeholder
Description
Stakeholder
Description
Manufacturer-Onshore Cabling
Stakeholder
Description
Stakeholder
Description
Owner-Offshore Transmission
Stakeholder
Description
Surveyor-Other
Stakeholder
Description
Vessel-Export Cable Installation(cable lay)
Stakeholder
Description
Stakeholder
Description
Date Event Description
Freemium Only 2016 Unlock with a freemium account Subscribers only field
Freemium Only 2016 Unlock with a freemium account By this date the cable installation was complete.... Subscribers only field
Freemium Only 2016 Unlock with a freemium account An update to the progress of is that one of the su... Subscribers only field
Freemium Only 2014 Unlock with a freemium account The second cable was installed on this day.... Subscribers only field
Freemium Only 2014 Unlock with a freemium account Cable installation started on this day at the Ibiz... Subscribers only field
Freemium Only 2014 Unlock with a freemium account The project was approved by the Spanish authoritie... Subscribers only field