TGS | Powered by 4C Offshore

4C is now TGS

We are excited to announce a significant milestone in 4C Offshore's journey. Our integration into the TGS family marks the beginning of a new era in offshore wind market intelligence.


Learn what this means for you!

Balearic Islands: ROMULO 2 Interconnector

Balearic Islands: ROMULO 2 is a domestic interconnector cable in Spain, with a capacity of 200MW.

Subscribe Now to view statistics on: Status, Cable Technology, Cable Current, Total Length in Kilometres, Total Length of Submarine Cable in Kilometres, Total Cable Length on Land in Kilometres, Country 1 Landfall Location, Country 2 Landfall Location, Country 1 Cable Type from Landfall to Substation, Country 2 Cable Type from Landfall to Substation, Country 1 Substation, Country 2 Substation, Grid Connection Point 1, Grid Connection Point 1, Project Cost in Millions (EUR), Website, Project Comments, Internal Notes, and Number of Cables.
Balearic Islands: ROMULO 2
200 MW
Spain Spain Flag | 4C Offshore
Spain Spain Flag | 4C Offshore

Premium

4C Offshore Premium, our most popular subscription, gives you full access to use the 4C Offshore WebApp which includes exclusive offshore wind, transmission and vessel reports, news and downloads.

Request a 30 minute Demo
Name
Spain
Landfall
Cable Type Landfall To Substation
Underground
Substation
Grid Connection Point

Cabling

Cable Name
Balearic Islands: ROMULO 2
Cable Type
Cable Current
Status
Capacity MW
200 MW
Cable Tech
Total Length of Cable
Length Submarine
Length Land
AC Voltage
Project Cost
Currency
Website
Comments
Name
Spain
Landfall
Cable Type Landfall To Substation
Underground
Substation
Grid Connection Point