Brenntangen - Solberg Replacement Cable Interconnector

Brenntangen - Solberg Replacement Cable
Norway
Norway

login to improve information access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads. Sign up now!

Country & Landfall 1

Country
Norway
Substation
Brenntangen

Subsea Cabling

Cable Name Brenntangen - Solberg Replacement Cable
Cable Type
Cable Current EHVAC
Status Fully Commissioned
Status Comments
Capacity MW
Cable Tech
Total Length of Cable 2.70 km
Length Submarine 1.55 km
Length Land 1.15 km
DC Voltage
AC Voltage 420 kV
Configuration
Project Cost Mill 600.00 Mill
Project Cost Currency NOK
Website Visit
Project Comments The original number of cables is 6 and they will be replaced with 7 cables (6 cables and 1 emergency cable). Both substations are due to be replaced along with the cables.

Country & Landfall 2

Country
Norway
Substation
Brenntangen
Designer-Other
Stakeholder
Description
EPC(I)-Cabling
Stakeholder
Description
Installer-Cabling
Stakeholder
Description
Manufacturer-Cabling
Stakeholder
Description
Owner-Offshore Transmission
Stakeholder
Description
Vessel-Cable Installation
Stakeholder
Description
Date Event Description
Freemium Only 2018 Unlock with a freemium account Subscribers only field
Freemium Only 2018 Unlock with a freemium account Statnet starts cable installation. The work will c... Subscribers only field
Freemium Only 2014 Unlock with a freemium account The project was granted a concession and expropri... Subscribers only field

Copyright © 4C Offshore 2019

  • ISO 14001 173953 2015 AHSO GBR UKAS 2 | 4C Offshore
  • Achilles UVDB Supply Chain Community | 4C Offshore