Copenhagen Harbour 30kV Replacement Cable Interconnector

Copenhagen Harbour 30kV Replacement Cable
(20.000 MW)
Denmark
Denmark

login to improve information access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads. Sign up now!

Country & Landfall 1

Country
Denmark
Substation
HC Ørstedsværket

Subsea Cabling

Cable Name Copenhagen Harbour 30kV Replacement Cable
Cable Type
Cable Current MVAC
Status Fully Commissioned
Status Comments
Capacity MW 20.000 MW
Cable Tech
Total Length of Cable 1.70 km
Length Submarine 0.65 km
Length Land 1.05 km
DC Voltage
AC Voltage 30 kV
Configuration
Project Cost Mill
Project Cost Currency
Website Visit
Project Comments

Country & Landfall 2

Country
Denmark
Substation
Islands Brygge
Installer-Cabling
Stakeholder
Description
Installer-Onshore Cabling
Stakeholder
Description
Manufacturer-Cabling
Stakeholder
Description
Manufacturer-Onshore Cabling
Stakeholder
Description
Owner-Offshore Transmission
Stakeholder
Description
Surveyor-Geotechnical
Stakeholder
Description
Date Event Description
Freemium Only 2017 Unlock with a freemium account Subscribers only field
Freemium Only 2016 Unlock with a freemium account Cable installation was scheduled to be conducted o... Subscribers only field
Freemium Only 2016 Unlock with a freemium account Cable installation was scheduled to begin around t... Subscribers only field
Freemium Only 2016 Unlock with a freemium account The DEA granted permission for the replacement of ... Subscribers only field
Freemium Only 2015 Unlock with a freemium account The project applied for consent in this month.... Subscribers only field

Copyright © 4C Offshore 2019

  • ISO 14001 173953 2015 AHSO GBR UKAS 2 | 4C Offshore
  • Achilles UVDB Supply Chain Community | 4C Offshore