Cyclades Phase A: Lavrio (Mainland) -Syros Interconnector

Cyclades Phase A: Lavrio (Mainland) -Syros
200 MW
Greece
Greece

login to improve information access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads. Sign up now!

Country And Landfall

Name
Greece
Cable Type Landfall To Substation
Underground
Substation

Cabling

Cable Name
Cyclades Phase A: Lavrio (Mainland) -Syros
Cable Current
Status
Capacity MW
200 MW
Total Length of Cable
Length Submarine
Length Land
AC Voltage
Comments

Country And Landfall

Name
Greece
Cable Type Landfall To Substation
Underground
Substation

Copyright © 4C Offshore 2019

  • ISO 14001 173953 2015 AHSO GBR UKAS 2 | 4C Offshore
  • Achilles UVDB Supply Chain Community | 4C Offshore