Cyclades Phase A: Syros-Tinos Interconnector

Syros
Cyclades Phase A: Syros-Tinos
(140.000 MW)
Tinos

Landfall to Substation information missing.

Landfall to Substation information missing.

Greece
Greece

login to improve information access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads. Sign up now!

Country & Landfall 1

Country
Greece
Landfall
Syros
Substation
Syros

Subsea Cabling

Cable Name Cyclades Phase A: Syros-Tinos
Cable Type
Cable Current HVAC
Status Fully Commissioned
Status Comments
Capacity MW 140.000 MW
Cable Tech
Total Length of Cable
Length Submarine 32.12 km
Length Land
DC Voltage
AC Voltage 150 kV
Configuration
Project Cost Mill
Project Cost Currency
Website Visit
Project Comments

Country & Landfall 2

Country
Greece
Landfall
Tinos
Substation
Tinos
EPC(I)-Cabling
Stakeholder
Description
EPC(I)-Onshore Substation
Stakeholder
Description
Installer-Cabling
Stakeholder
Description
Installer-Substation (Topside and Foundation)
Stakeholder
Description
Stakeholder
Description
Manufacturer-Cabling
Stakeholder
Description
Manufacturer-Onshore Substation
Stakeholder
Description
Manufacturer-Substation (Topside and Foundation)
Stakeholder
Description
Owner-Offshore Transmission
Stakeholder
Description
Vessel-Cable Installation
Stakeholder
Description
Stakeholder
Description
Stakeholder
Description
Date Event Description
Freemium Only 2018 Unlock with a freemium account Subscribers only field
Freemium Only 2017 Unlock with a freemium account The substation is scheduled to be delivered in Jul... Subscribers only field
Freemium Only 2016 Unlock with a freemium account Update regarding the delays to the Syros substatio... Subscribers only field
Freemium Only 2015 Unlock with a freemium account The cable installation was completed including lan... Subscribers only field
Freemium Only 2015 Unlock with a freemium account The cable lay was completed by this date.... Subscribers only field
Freemium Only 2015 Unlock with a freemium account The cable installation was ongoing on this date.... Subscribers only field
Freemium Only 2015 Unlock with a freemium account The cable installation was ongoing on this date.... Subscribers only field