TGS | Powered by 4C Offshore

4C is now TGS

We are excited to announce a significant milestone in 4C Offshore's journey. Our integration into the TGS family marks the beginning of a new era in offshore wind market intelligence.


Learn what this means for you!

Cyclades Phase C: Lavrio (Mainland)-Siros (Second Link) Interconnector

Cyclades Phase C: Lavrio (Mainland)-Siros (Second Link) is a domestic interconnector cable in Greece, with a capacity of 200MW.

Subscribe Now to view statistics on: Status, Cable Current, Total Length in Kilometres, Total Length of Submarine Cable in Kilometres, Total Cable Length on Land in Kilometres, Country 1 Landfall Location, Country 2 Landfall Location, Country 1 Cable Type from Landfall to Substation, Country 2 Cable Type from Landfall to Substation, Country 1 Substation, Country 2 Substation, Project Cost in Millions (EUR), Project Comments, Internal Notes, and Number of Cables.
Cyclades Phase C: Lavrio (Mainland)-Siros (Second Link)
200 MW
Greece Greece Flag | 4C Offshore
Greece Greece Flag | 4C Offshore

Premium

4C Offshore Premium, our most popular subscription, gives you full access to use the 4C Offshore WebApp which includes exclusive offshore wind, transmission and vessel reports, news and downloads.

Request a 30 minute Demo
Name
Greece
Landfall
Cable Type Landfall To Substation
Underground
Substation

Cabling

Cable Name
Cyclades Phase C: Lavrio (Mainland)-Siros (Second Link)
Cable Current
Status
Capacity MW
200 MW
Total Length of Cable
Length Submarine
Length Land
AC Voltage
Project Cost
Currency
Comments
Name
Greece
Landfall
Cable Type Landfall To Substation
Underground
Substation