DKE-PL-1 Interconnector

Avedøre
DKE-PL-1
(600.000 MW)
Dunowo

Substation to Converter cabling information missing.

Converter information missing.

Landfall to Converter cabling information missing.

Landfall to Converter cabling information missing.

Converter information missing.

Substation to Converter cabling information missing.

Denmark
Poland

login to improve information access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads. Sign up now!

Country & Landfall 1

Country
Denmark
Substation
Avedøre

Subsea Cabling

Cable Name DKE-PL-1
Cable Type
Cable Current HVDC
Status Concept/Early Planning
Status Comments TYNDP 2018 Project Index: 234 Under consideration.
Capacity MW 600.000 MW
Cable Tech
Total Length of Cable 330.00 km
Length Submarine 305.00 km
Length Land 25.00 km
DC Voltage 400 kV
AC Voltage
Configuration
Project Cost Mill 500.00 Mill
Project Cost Currency EUR
Website Visit
Project Comments

Country & Landfall 2

Country
Poland
Substation
Dunowo
Owner-Offshore Transmission
Stakeholder
Description
Stakeholder
Description
Date Event Description
Freemium Only 2033 Unlock with a freemium account Subscribers only field
Freemium Only 2032 Unlock with a freemium account Estimated offshore installation given commissionin... Subscribers only field

Copyright © 4C Offshore 2019

  • ISO 14001 173953 2015 AHSO GBR UKAS 2 | 4C Offshore
  • Achilles UVDB Supply Chain Community | 4C Offshore