East West Interconnector

Shotton
Shotton
East West
(500.000 MW)
Woodland
Woodland
United Kingdom
Ireland

login to improve information access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads. Sign up now!

Country & Landfall 1

Country
United Kingdom
Landfall
Barky Beach
Cable Type Landfall To Converter
Underground
Length Land Cable To Converter
30.00 Km
Converter
Shotton
Cable Type Converter To Substation
Underground
Substation
Shotton

Subsea Cabling

Cable Name East West
Cable Type Interconnector
Cable Current HVDC
Status Fully Commissioned
Status Comments
Capacity MW 500.000 MW
Cable Tech
Total Length of Cable 261.00 km
Length Submarine 186.00 km
Length Land 75.00 km
DC Voltage 200 kV
AC Voltage
Configuration Symmetrical monopole
Project Cost Mill 600.00 Mill
Project Cost Currency EUR
Website Visit
Project Comments

Country & Landfall 2

Country
Ireland
Landfall
Rush North Beach
Cable Type Landfall To Converter
Underground
Length Land Cable To Converter
45.00 Km
Converter
Woodland
Cable Type Converter To Substation
Underground
Substation
Woodland
Designer-Other
Stakeholder
Description
EPC(I)-Cabling
Stakeholder
Description
Installer-Cabling
Stakeholder
Description
Installer-HVDC Converter
Stakeholder
Description
Installer-Onshore Cabling
Stakeholder
Description
Maintenance-Cabling
Stakeholder
Description
Maintenance-Other
Stakeholder
Description
Manufacturer-Cabling
Stakeholder
Description
Manufacturer-HVDC Converter
Stakeholder
Description
Manufacturer-Onshore Cabling
Stakeholder
Description
Owner-Offshore Transmission
Stakeholder
Description
Surveyor-Geophysical
Stakeholder
Description
Stakeholder
Description
Stakeholder
Description
Surveyor-Geotechnical
Stakeholder
Description
Vessel-Export Cable Installation(burial)
Stakeholder
Description
Stakeholder
Description
Vessel-Export Cable Installation(cable lay)
Stakeholder
Description
Stakeholder

Unlock with a freemium account -United Arab Emirates

Description
Vessel-Survey(Geophysical)
Stakeholder
Description
Stakeholder
Description
Stakeholder
Description
Date Event Description
Freemium Only 2019 Unlock with a freemium account Subscribers only field
Freemium Only 2016 Unlock with a freemium account The interconnector came back online following an o... Subscribers only field
Freemium Only 2016 Unlock with a freemium account During annual maintenance of the Irish converter d... Subscribers only field
Freemium Only 2015 Unlock with a freemium account Hydrographic and geophysical surveys were schedule... Subscribers only field
Freemium Only 2015 Unlock with a freemium account The hydrographic and geophysical surveys were sche... Subscribers only field
Freemium Only 2012 Unlock with a freemium account The power was deferred in October 2012 due to tele... Subscribers only field
Freemium Only 2012 Unlock with a freemium account The project was inaugurated on this date by minist... Subscribers only field
Freemium Only 2012 Unlock with a freemium account The cable installation was completed on this date.... Subscribers only field
Freemium Only 2011 Unlock with a freemium account Submarine cable installation started on this date.... Subscribers only field
Freemium Only 2010 Unlock with a freemium account Construction of the interconnector started in this... Subscribers only field
Freemium Only 2009 Unlock with a freemium account An Bord Pleanala granted full permission to EirGri... Subscribers only field