Estlink2 Interconnector

Pussi
Pussi
Estlink2
(650.000 MW)
Antilla
Antilla
Estonia
Finland

login to improve information access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads. Sign up now!

Country & Landfall 1

Country
Estonia
Landfall
Pussi
Cable Type Landfall To Converter
Underground
Length Land Cable To Converter
14.00 Km
AC Voltage
330 kV
Converter
Pussi
Cable Type Converter To Substation
Underground
Substation
Pussi

Subsea Cabling

Cable Name Estlink2
Cable Type Interconnector
Cable Current HVDC
Status Fully Commissioned
Status Comments
Capacity MW 650.000 MW
Cable Tech
Total Length of Cable 170.00 km
Length Submarine 145.00 km
Length Land
DC Voltage 450 kV
AC Voltage
Configuration Monopolar with metallic return
Project Cost Mill 320.00 Mill
Project Cost Currency EUR
Website Visit
Project Comments

Country & Landfall 2

Country
Finland
Landfall
Antilla
Cable Type Landfall To Converter
Overhead
Length Land Cable To Converter
12.00 Km
AC Voltage
400 kV
Converter
Antilla
Cable Type Converter To Substation
Underground
Substation
Antilla
Designer-Other
Stakeholder
Description
EPC(I)-Cabling
Stakeholder
Description
Installer-Cabling
Stakeholder
Description
Installer-Export Cabling(burial)
Stakeholder
Description
Installer-HVDC Converter
Stakeholder
Description
Installer-Onshore Cabling
Stakeholder
Description
Stakeholder
Description
Manufacturer-Cabling
Stakeholder
Description
Manufacturer-HVDC Converter
Stakeholder
Description
Manufacturer-Onshore Cabling
Stakeholder
Description
Owner-Offshore Transmission
Stakeholder
Description
Stakeholder
Description
Surveyor-Geotechnical
Stakeholder
Description
Vessel-Export Cable Installation(cable lay and burial)
Stakeholder
Description
Date Event Description
Freemium Only 2020 Unlock with a freemium account Subscribers only field
Freemium Only 2020 Unlock with a freemium account The fault repair actions were completed early on 1... Subscribers only field
Freemium Only 2019 Unlock with a freemium account Fingrid starts fault repair actions at EstLink2 An... Subscribers only field
Freemium Only 2019 Unlock with a freemium account 27th Dec 2019 at 20:02 a disturbance was detected ... Subscribers only field
Freemium Only 2017 Unlock with a freemium account Elering's investment budget for 2017-2021 states t... Subscribers only field
Freemium Only 2014 Unlock with a freemium account After successful testing the cable was made availa... Subscribers only field
Freemium Only 2013 Unlock with a freemium account The last energisations of the cable were carried o... Subscribers only field
Freemium Only 2012 Unlock with a freemium account The submarine cable lay operation was started with... Subscribers only field
Freemium Only 2012 Unlock with a freemium account Preparatory work started on the 12km underground c... Subscribers only field