Fundy Isles: Deer Island-Campobello Island Replacement cable Interconnector

Chocolate Cave
Fundy Isles: Deer Island-Campobello Island Replacement cable
(50.000 MW)
Wilsons Beach

Landfall to Substation information missing.

Landfall to Substation information missing.

Canada
Canada

login to improve information access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads. Sign up now!

Country & Landfall 1

Country
Canada
Landfall
Chocolate Cave
Substation
Chocolate Cave

Subsea Cabling

Cable Name Fundy Isles: Deer Island-Campobello Island Replacement cable
Cable Type
Cable Current HVAC
Status Under Construction
Status Comments The Fundy Isles Submarine Cables provide electricity to Deer Island to Campobello Island, Campobello Island and Grand Manan Island. The original cables were installed in 1978 and are nearing the end of their useful life.The new cables will be rated higher than the existing to allow for the potential addition of future renewable energy projects.
Capacity MW 50.000 MW
Cable Tech
Total Length of Cable
Length Submarine 3.40 km
Length Land
DC Voltage
AC Voltage 69 kV
Configuration
Project Cost Mill
Project Cost Currency
Website Visit
Project Comments

Country & Landfall 2

Country
Canada
Landfall
Wilsons Beach
Substation
Wilsons Beach
EPC(I)-Cabling
Stakeholder
Description
Installer-Cabling
Stakeholder
Description
Stakeholder
Description
Manufacturer-Cabling
Stakeholder
Description
Owner-Offshore Transmission
Stakeholder
Description
Vessel-Cable Installation
Stakeholder
Description
Date Event Description
Freemium Only 2019 Unlock with a freemium account Subscribers only field
Freemium Only 2019 Unlock with a freemium account Maersk Connector has completed cable installation.... Subscribers only field
Freemium Only 2019 Unlock with a freemium account DeepOcean has started cable installation.... Subscribers only field
Freemium Only 2019 Unlock with a freemium account The replacement cable and termination works are un... Subscribers only field
Freemium Only 2018 Unlock with a freemium account NB Power has been given the green light by the New... Subscribers only field
Freemium Only 2018 Unlock with a freemium account The terrestrial work started this fall and will be... Subscribers only field
Freemium Only 2018 Unlock with a freemium account The environmental impact report has been submitted... Subscribers only field

Copyright © 4C Offshore 2019

  • ISO 14001 173953 2015 AHSO GBR UKAS 2 | 4C Offshore
  • Achilles UVDB Supply Chain Community | 4C Offshore