TGS | Powered by 4C Offshore

4C is now TGS

We are excited to announce a significant milestone in 4C Offshore's journey. Our integration into the TGS family marks the beginning of a new era in offshore wind market intelligence.


Learn what this means for you!

Harmony Link Interconnector

Harmony Link is connected from Poland to Lithuania, with a capacity of 700MW.

Subscribe Now to view statistics on: Status, Cable Current, Total Length in Kilometres, Total Length of Submarine Cable in Kilometres, Total Cable Length on Land in Kilometres, Direct Current (DC) in Kilovolt (kV), Country 2 Cable Type from Landfall to Substation, Country 1 Substation, Country 2 Substation, Project Cost in Millions (EUR), Internal Notes, and Number of Cables.
Harmony Link
700 MW

Unkown Cable Type

Unkown Converter

Unkown Cable Type

Poland Poland Flag | 4C Offshore
Lithuania Lithuania Flag | 4C Offshore

Premium

4C Offshore Premium, our most popular subscription, gives you full access to use the 4C Offshore WebApp which includes exclusive offshore wind, transmission and vessel reports, news and downloads.

Request a 30 minute Demo
Name
Poland
Substation

Cabling

Cable Name
Harmony Link
Cable Current
Status
Capacity MW
700 MW
Total Length of Cable
Length Submarine
Length Land
DC Voltage
Project Cost
Currency
Name
Lithuania
Cable Type Landfall To Substation
Underground
Substation