Kontek Interconnector

Bentwisch
Bentwisch
Kontek
(600.000 MW)
Bjaeverskov
Bjaeverskov
Germany
Denmark

login to improve information access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads. Sign up now!

Country & Landfall 1

Country
Germany
Landfall
Markgrafenheide
Cable Type Landfall To Converter
Underground
Length Land Cable To Converter
13.00 Km
AC Voltage
400 kV
Converter
Bentwisch
Cable Type Converter To Substation
Underground
Substation
Bentwisch

Subsea Cabling

Cable Name Kontek
Cable Type Interconnector
Cable Current HVDC
Status Decommissioned
Status Comments
Capacity MW 600.000 MW
Cable Tech
Total Length of Cable 171.00 km
Length Submarine 52.00 km
Length Land 119.00 km
DC Voltage 400 kV
AC Voltage
Configuration Monopolar
Project Cost Mill
Project Cost Currency
Website Visit
Project Comments The cable runs over the island of Falster. The approximate distances are Bentwisch to Markgrafenheide 13km underground, Markgrafenheide to Gedser on Falster 45km submarine, 50km underground cable running over Falster, 7km submarine cable to Sealand, on Sealand 7km to Bjaeverskov. The cable has two cores, essentially two cables bundled.

Country & Landfall 2

Country
Denmark
Landfall
Falster
Cable Type Landfall To Converter
Underground
Length Land Cable To Converter
106.00 Km
AC Voltage
400 kV
Converter
Bjaeverskov
Cable Type Converter To Substation
Underground
Substation
Bjaeverskov
Installer-Cabling
Stakeholder
Description
Installer-HVDC Converter
Stakeholder
Description
Installer-Onshore Cabling
Stakeholder
Description
Maintenance-Cabling
Stakeholder
Description
Manufacturer-Cabling
Stakeholder
Description
Manufacturer-HVDC Converter
Stakeholder
Description
Manufacturer-Onshore Cabling
Stakeholder
Description
Owner-Offshore Transmission
Stakeholder
Description
Stakeholder
Description
Vessel-Decommissioning
Stakeholder
Description
Vessel-Operations and Maintenance
Stakeholder
Description
Stakeholder
Description
Stakeholder
Description
Date Event Description
Freemium Only 2011 Unlock with a freemium account Subscribers only field
Freemium Only 2009 Unlock with a freemium account Number of cable repairs has been made to the cable... Subscribers only field
Freemium Only 2008 Unlock with a freemium account A number of repairs to the cable were made between... Subscribers only field
Freemium Only 2007 Unlock with a freemium account Number of cable repairs has been made to the cable... Subscribers only field
Freemium Only 2006 Unlock with a freemium account Cable repairs to the cable were conducted on the c... Subscribers only field
Freemium Only 2002 Unlock with a freemium account JD Contractor carried out a cable repair campaign ... Subscribers only field
Freemium Only 1995 Unlock with a freemium account The project became fully commissioned in this year... Subscribers only field